Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg 1 Comment

ALT Allocation of Test Units

ALT Allocation of Test Units

One question that you should consider when planning multiple stress accelerated life test (ALT) is the allocation of test units to the various stresses.

We want to create a model detailing the relationship between stress and time to failure. We also want to project the time to failure estimates to use conditions. Ideally, we test at nominal conditions only and gather time to failure information. We do not have the luxury of time thus explore using ALT.

One method of allocation is to place an equal number of samples with each stress level. Is that the best approach?

General ALT Planning Guidelines

In How to Plan an Accelerated Life Test: Some Practical Guidelines (The ASQC Basic References in Quality Control, Vol. 10) (The Asqc Basic References in Quality Control; V. 10), William Q. Meeker and Gerald J. Hahn outlined a few basic guidelines to consider during ALT planning.

  1. Restrict the stress range over which the failures that occur across the range, including use conditions are the same. A failure at high stress has the same failure mechanism and essentially the same path to failure. The idea is to avoid phase changes or fundamentally different failure mechanisms. This sets the high stress level.
  2. For the middle-stress level select a level that is far from the high-stress level (helps to create a better estimate of the relationship slope), yet is sufficiently high to yield about 10% failures within the testing time period.
  3. The lowest stress level is as close as possible to use stress levels but still expected to generate a few failures during the testing.

For each stress level, we need failures. When you have time, run all units to failure. You can use a ‘guess’ or assumed time to failure model to estimate the number of failures at each stress level for a different number of samples. This is just for planning to aid in selecting appropriate ALT stress levels.

The 4:2:1 Plan for Allocation of Test Units

With three ALT stress levels determined, the question turns to how many samples to allocate to each level. Considering the goal is estimating time to failure distribution at use conditions using a regression model relating time to failure and stress, we improve the accuracy by having a reasonable estimate of the slope of the relationship and by having more information closer to the use conditions.

The distance between stress levels impacts the accuracy of the slope estimate. Using stress levels as far apart as possible improves the statistical regression modeling to estimate the slope.

At each stress, we are attempting to estimate a time to failure distribution. We need failures to do so. The more failures the better. The closer the lowest stress level is to use conditions the less of an extrapolation to use conditions and the lower the probability of failures occurring.

It’s a balancing act or optimization problem with imperfect information.

Meeker and Hahn work out an optimized plan based on just two ALT stress levels. This really only works when you have an accurate estimate of the time to failure distribution and acceleration model. We may not have suitable conditions to ‘optimize’.

Meeker and Hahn then outline an optimum test plan with an equal number of failures per stress level. They recommend using a ratio of 4:2:1 samples for the low: middle:high-stress levels, respectively.

Thus if you have 21 samples available for the ALT place 12 units under the lowest stress condition, 6 in the middle level, and just 3 in the highest level. If the stress levels are selected appropriately you should expect about 3 failure per stress level.

Of course, more samples the better. This will certainly be limited by the number of samples available, cost, testing capability, and measurement facilities.

How do you set up your ALT? Do you use multiple stresses and do you have a favorite algorithm to allocate samples to the various stress level? Share your advice or experience in the comments section below.

References:

William Q. Meeker and Gerald J. Hahn, How to Plan an Accelerated Life Test: Some Practical Guidelines (The ASQC Basic References in Quality Control, Vol. 10) (The ASQC Basic References in Quality Control; V. 10) Milwaukee, WI: ASQC Quality Press.


*Accendo Reliability participates in the Amazon Services LLC Associates Program. This affiliate advertising program provides a way for sites to earn a commission on links to Amazon. In short, this means when you buy something on Amazon after following a link from this site, we get a small percentage of its price. This helps support Accendo Reliability by offsetting a portion of the cost to maintain the site. And, your support is much appreciated.

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Accelerated life tests, Reliability test planning

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Introduction to Testing 1 2 3
How to Keep Sight of the Big Picture and Avoid being a Slave to Reliability »

Comments

  1. Kirk Gray says

    June 26, 2017 at 1:16 PM

    Fred, for a minute I thought the title of the article might have related to the number you request from management for how many units you need. I have heard from reliability engineers that management will give them one unit for HALT or ALT. the 4:2:1 sample allocations come from this discussion.
    RE to management: ” I need four units to perform a good HALT or ALT”
    Management: “We do not have the budget for you to potentially damage or destroy 4 units”
    RE to management: “Ok, how about two units?”
    Management: “We only have the budget for one sample to pass the HALT or ALT testing”
    RE to management: “Ok, one sample it is”

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy