Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » on Maintenance Reliability » Page 78

on Maintenance Reliability

A listing in reverse chronological order of these article series:



  • Usman Mustafa Syed — Aasan Asset Management series

  • Arun Gowtham — AI & Predictive Maintenance series

  • Miguel Pengel — Asset Management in the Mining Industry series

  • Bryan Christiansen — CMMS and Reliability series

  • James Reyes-Picknell — Conscious Asset series

  • Alex Williams — EAM & CMMS series

  • Nancy Regan — Everday RCM series

  • Karl Burnett — History of Maintenance Management series

  • Mike Sondalini — Life Cycle Asset Management series

  • James Kovacevic — Maintenance and Reliability series

  • Mike Sondalini — Maintenance Management series

  • Mike Sondalini — Plant Maintenance series

  • Andrew Kelleher — Process Plant Reliability Engineering series

  • George Williams and Joe Anderson — The ReliabilityXperience series

  • Doug Plucknette — RCM Blitz series

  • Robert Kalwarowsky — Rob's Reliability Project series

  • Gina Tabasso — The Intelligent Transformer Blog series

  • Tor Idhammar — The People Side of Maintenance series

  • André-Michel Ferrari — The Reliability Mindset series

by Mike Sondalini Leave a Comment

Oil — How Clean Does it Have to Be?

Oil — How Clean Does it Have to Be?

Clean, dry oil can extend equipment life between failure up to 8 – 10 times the normal operating life. Timken, the bearing manufacturer, reports that reducing water levels from 100 ppm (parts per million) to 25 ppm increases bearing life 2 times. British hydraulics research indicates that if solids contamination with particles larger than 5 microns (0.005 mm or 0.0002”) is reduced from the range of 5,000 – 10,000 particles per milliliter of oil to 160 – 320 particles, the machine life is increased 5 times. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Doug Plucknette 2 Comments

Equipment Reliability Depends On Understanding Failure Modes!

Equipment Reliability Depends On Understanding Failure Modes!

One of the curses of Reliability Centered Maintenance and Root Cause Analysis is a great Facilitator makes the process look easy. So easy in fact that after watching a good facilitator lead one event we’d like to believe we could jump right up and facilitate the next one with no training or assistance. In Mentoring RCM Blitz™ facilitators during the certification process we work to perfect 2 dozen skills with the hope of turning out great facilitators. The skill we typically spend the most time working on is writing failure modes.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by James Kovacevic Leave a Comment

A 2-Step Process to Improve Plant Performance

A 2-Step Process to Improve Plant Performance

A Simple Q&A Can Reap Improved Performance in Any Activity in Maintenance.

A failure has just occurred on a critical asset in your facility.  The result was 2 hours of lost production, but it could have been worse.  The last time that the equipment failure occurred it took 5 hours to repair.  Why was the failure repaired in less than half the time than the previous occurrence?  How can we ensure that we learn from this failure and the team’s performance to improve the plant performance?

I remember reading about a simple philosophy quite a few years ago (although I can’t remember who stated it, so I apologize that I cannot provide a reference), about a simple analysis that can be applied to any maintenance activity to improve performance.  This analysis is call the 2 Up / 2 Down analysis.

The 2 Up / 2 Down analysis is quite simple and involves asking two questions.
[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Defect elimination, Reliability program

by Mike Sondalini Leave a Comment

Reducing Wear in Abrasive Conditions

Reducing Wear in Abrasive Conditions

Abrasion is the removal of material from a surface by the movement of material across its surface. The factors affecting abrasive wear are the surface properties of the item being worn away, the abrasive properties of the material moving across the surface and the characteristics of motion. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Doug Plucknette Leave a Comment

The Problem With Our Top Down Reliability Effort!

The Problem With Our Top Down Reliability Effort!

I’m using this week to get my office in order. This morning I found this series of drawings I did back around 1987. While I know my old friends from Building 317 will get a kick out of this, I also know that we weren’t the first and won’t be the last team of people who worked to make our plant a better place to work.  I also know the last slide from this series is missing that showed the team alone saying “If you want to know how it happened, it pays to give credit where credit is due.” [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by James Kovacevic Leave a Comment

Step Change Your Plant Performance with Defect Elimination

Step Change Your Plant Performance with Defect Elimination

Why Preventative Maintenance Alone Will Not Drive a Step Change in Your Plant Performance and What You Can You Do About It

Many organizations try to improve performance by just creating PM routines and letting the technicians loose to perform the work.  This often has negative effects on plant performance.  This has been proven through studies conducted by Ledet at numerous DuPont sites.  This study looked at the impact of Planning, Scheduling and Preventative Maintenance on Plant Performance.

Ledet had found that by just implementing a PM / PdM program, organizations lost 2.40% of uptime (on a baseline of 83.50%).  Not quite the results to expect when implementing a strategy to improve plant performance.  When the PM / PdM program is implemented with Planning & Scheduling, the plant saw an increase of 5.10%.  Now that is an improvement.

But what about the remaining 11.40% of uptime?  How does one address the remaining downtime?
[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Defect elimination, Predictive maintenance, Preventive Maintenance (PM)

by Doug Plucknette Leave a Comment

You know it’s time to focus on reliability when…

You know it’s time to focus on reliability when…

With 2016 having come to an end, I thought it would be fun to start 2017 with some laughs about when your company realized it was time to focus on reliability.  I have a 3-person team who will vote for the best submission on Friday the winner will receive a signed copy of my book Reliability Centered Maintenance Using RCM Blitz™ [this is a reposting of Doug’s article and let’s see if he has another book to give away.) [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Mike Sondalini 6 Comments

Using manometers for measuring pressure 

Using manometers for measuring pressure 

A U-tube manometer is the simplest of the pressure measurement devices. Its name comes from the U-shape formed when the two ends of a flexible tube full of liquid are raised to keep the liquid from coming out the ends. A U-tube manometer is a ‘liquid’ balance. 

A spring balance used in the kitchen weighs a load by matching the force produced by the weight of the load with the force produced from the tension of the balance spring. The change in length of the spring is a measure of the load’s weight and is shown on a graduated scale by a pointer attached to the spring. Similarly, a U- tube manometer is used to balance the weight of the liquid in one leg of the ‘U’ against the pressure introduced into the other leg. The difference in height between the two legs of liquid represents the pressure pushing the liquid down one leg and up the other. The height difference is measured on a graduated scale. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Mike Sondalini 1 Comment

Gear Pump Operation & Maintenance

Gear Pump Operation & Maintenance

A gear pump uses two meshing, toothed cogs to force water from the inlet of the pump through to the outlet. Figure No. 1 shows a simplified drawing of an external teeth gear pump on the left along with the alternate arrangement of internally pointing teeth. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Doug Plucknette 1 Comment

It’s Time To Bring Back Skilled Trade Apprentice Programs!

It’s Time To Bring Back Skilled Trade Apprentice Programs!

As I work with teams of operators and skilled trades people performing RCM analyses at companies around the world at some point in time as we are discussing the failure modes and effects I might ask the question; how does your company ensure that the skilled trades people working on your assets are actually qualified to work on the equipment?

This question is often met with a look of confusion. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Mike Sondalini Leave a Comment

Tools to Focus on Plant Reliability

Tools to Focus on Plant Reliability

The focus of maintenance has changed from repairing equipment to keeping it running for longer between breakdowns. This requires more consideration of how to get longer running life between repairs, i.e. higher reliability, on a machine. To accomplish this a number of ‘tools’ have been invented and developed to allow maintainers to pinpoint problems and fix them. In this article three of the most effective ‘tools’ will be introduced. Root cause analysis, Weibull analysis and lifecycle simulation can be used to help organisations achieve proactive approaches to maintenance or adopt a “reliability based approach” to maintenance.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Doug Plucknette Leave a Comment

The Two Faces of RCM

The Two Faces of RCM

I had a conference call this morning with some potential clients in regard to rolling out a RCM Blitz™ effort. The sad thing about Reliability Centered Maintenance is the reputation the tool has acquired over the last 40 years has one of two faces.

The sad, tragic and more popular face is that if the Resource Consuming Monster. The reputation that RCM is too detailed, that it takes too long, and that by the time you finish your analysis there are no recourses and there is no money left for implementation. According to a survey conducted on ReliabilityWeb.com nearly 70% of all RCM implementations fail, with statistics like this, it is a wonder the tool still exists. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz Tagged With: Reliability Centered Maintenance (RCM)

by Mike Sondalini Leave a Comment

Job Safety on Hazardous & Dangerous Work

Job Safety on Hazardous & Dangerous Work

See www.jsaprograms.com for innovation in hazard control.

Doing a job safely is no accident! Like all good outcomes safety is a result of good planning. As the Chinese philosopher Confucius said, “In all things success depends on previous preparation and without such preparation there is sure to be failure.” If you want safe work it needs to be planned as part of the job.

The other important fact about safety is that it is a personal responsibility. It is up to you to do the job safely. There is not a manager or supervisor in the world that wants to go to prison or be fined for a death or maiming because of his negligence. That means people in-charge want jobs done safely too. All they ask is that the safety procedures and practices used on the job be the least that are adequate while still meeting all the safety issues.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Doug Plucknette Leave a Comment

Reliability Amnesia!

Reliability Amnesia!

The condition that occurs when an Engineer, Supervisor, or Manager who once had responsibility for the reliability of your assets gets promoted or transferred to the operations side of the group.

Symptoms of Reliability Amnesia

1.      Ignoring information from Condition Based Technologies that clearly show a major component is in the process of failing. The subject may be overheard saying something like “I can’t afford to stop the line now, if we do I won’t make my production goals.” [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Mike Sondalini Leave a Comment

Centrifugal Pump Life Extension – The Volute

Centrifugal Pump Life Extension – The Volute

Centrifugal Pump Life Extension – The Volute

What readers will learn from this article.

  • Pump volute problems and fixes.
  • Pump set-up and piping connection issues to get right.
  • Process conditions that will cause problems.
  • What to watch for with pump shaft designs.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

  • « Previous Page
  • 1
  • …
  • 76
  • 77
  • 78
  • 79
  • 80
  • …
  • 96
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • Work Quality Assurance with ACE 3T Standard Operating Procedures
  • The Power of Empowering Employees
  • Book Review: An Elementary Guide to Reliability
  • 5 Why’s
  • Equipment Defect Elimination Strategy

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.