Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

All articles listed in reverse chronological order.

by Carl S. Carlson Leave a Comment

Discussing the Controversial Subject of FMEA Prepopulation

Discussing the Controversial Subject of FMEA Prepopulation

To Prepopulate or not to prepopulate, that is the question

By prepopulating the highest priority functions, along with other selected information, the FMEA team can focus their efforts on the most important functions, and minimize in-meeting time. This is the last step in FMEA preparation. However, there are specific limitations to FMEA prepopulation that must be understood and adhered to.

“Give me six hours to chop down a tree and I will spend the first four sharpening the axe.”
Abraham Lincoln

[Read more…]

Filed Under: Articles, Inside FMEA, on Tools & Techniques

by Dennis Craggs Leave a Comment

MSA 3 – Gage Bias

MSA 3 – Gage Bias

Introduction

In my prior article, Measurement Systems, the total variation in the measurement data was partitioned into part variation (PV), assessor variation (AV), and equipment variation (EV). GR&R is the square root of the sum of the squares of AV and EV. If the ratio of GRR/TV is less than 10%, then the measurement system variation was acceptable.

In addition to variation, data bias needs to be considered. This bias is created by systematic measurement errors.
[Read more…]

Filed Under: Articles, Big Data & Analytics, on Tools & Techniques

by Nancy Regan Leave a Comment

Ok…I’m going to “level” with you…

Ok…I’m going to “level” with you…

This is one of the biggest reasons for one of the biggest misconceptions of the RCM process. If you’ve done RCM and it took you way too long, this may be the reason… [Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by George Williams Leave a Comment

PdM, Condition Monitoring, and Condition Based Maintenance: What’s the Difference? – Part 1

PdM, Condition Monitoring, and Condition Based Maintenance: What’s the Difference? – Part 1

Predictive Maintenance, Condition Monitoring, and Condition Based Maintenance have not been clearly defined and we are looking to begin a dialogue to create a standard definition for these terms. Join us as we begin our discussion. [Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Adam Bahret Leave a Comment

Doing Nothing is Stressful

Doing Nothing is Stressful

I was recently giving a presentation for IEEE at MIT Lincoln Labs here in the Boston area.  The topic was one of my favorites, my new playground, Use Case 7 !  The crowd loved the idea of expanding how we access use cases and came up with great examples. and experiences, of their own.  They found many areas in their work where the Use Case 7 exercise may yield some interesting insight.

[Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Perry Parendo Leave a Comment

QFD

QFD

The QFD concept is widely known, yet appears to be used infrequently. Too time consuming for the value, but it is a “good idea.” There are several schools of thought, and certainly practical approaches for implementation that can provide needed business solutions. This video introduces the topic. If you want help with implementation, or with training – contact us to obtain the break throughs available. [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

by Greg Hutchins Leave a Comment

Resilience & Enterprise Risk Management

Resilience & Enterprise Risk Management

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The term resilience is used in reports and studies by numerous government agencies and international institutions.  For instance, in 20014 the Organization forEconomic Cooperation and Development issued a report entitled “OECD Reviews ofRisk Management Policies: Boosting Resilience Through Innovative Risk Governance”. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Fred Schenkelberg Leave a Comment

Building a Frequency Table

Building a Frequency Table

In a meeting the other day, the presenter was talking about a range of different failures for the product in question. She talked about each issue, a bit about the failure analysis, yet didn’t reveal which failures occurred more or less often.

She did provide a handout with a listing of the problems in order of the product field age and listing of the failure name (component or system involved). So, I grabbed a piece of paper to create a frequency table so I could quickly determine which problems occurred more often than others. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Non-parametric statistical methods

by James Kovacevic Leave a Comment

Insights into Preventive Maintenance Made Simple with Doug Stangier

I recently had the pleasure to interview Doug Stangier, co-author of Preventive Maintenance Made Simple.  This is another excellent book in the Made Simple series, published by ReliabilityWeb.  During the interview, Doug not only provides insights into his book but also into what world class Preventive Maintenance looks like.   Anyone new to maintenance and reliability, or seasoned experts can benefit from this great book.  Without further delay, here is the interview with Doug.

[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Preventive Maintenance

by Les Warrington 5 Comments

Calculating Network Reliability

Calculating Network Reliability

I have worked in the field of reliability for a good many years.  I have presented both beginner and advanced reliability engineering courses. I have even read several books. 🙂 But, across all this, component redundancy has never been explained beyond simple serial and parallel configurations.

So, it was a shock to my system to be presented with a scenario that couldn’t be solved using a simple parallel system.

My previous work had challenged me only as far as:

  • Serial
  • Active parallel
  • Stand-by parallel
  • M-out-of-n parallel
  • Keystone-component parallel

But now I was being challenged by a network that was none of these.

[Read more…]

Filed Under: Achieving the Benefits of Reliability, Articles, on Product Reliability Tagged With: network reliability, network topology, Redundancy, system reliability

by Greg Hutchins Leave a Comment

Integrating ISO 31000:2018 Risk Management Throughout the Organization

Integrating ISO 31000:2018 Risk Management Throughout the Organization

Guest Post by Robert Pojasek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In 2012, ISO’s ‘Joint Technical Coordinating Group’ (JTCG) completed work to provide a high-level structure, text, and common terms and definitions for all future and revised management system standards. All Technical Committees developing management system standards were required to follow Annex SL found in the ISO/IEC Directives, Part 1, Annex SL[i].   

As we approach 2019, it is abundantly clear that the high-level structure mandate has been followed by the Technical Committees with mixed results. All the new and revised management systems used the 10-clause structure and all of them include the same definition of risk and risk management.  However, the way risk management was used in the different management system standards varied considerably. What can an organization learn from this exercise? [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Robert Allen Leave a Comment

Fundamentals of Applying a Structured Approach

Fundamentals of Applying a Structured Approach

In reviewing several previous articles in this article series, it’s apparent there is much in common with product development, project management and process improvement.

Let’s look at a brief list that considers a structured approach vs. unstructured

While this list is pretty “high-level” it reveals the importance of project leadership, governance and management.  A structured approach (for example a phase-gate structure, DMAIC or agile/scrum) enables management and planning, which enables governance and governance enables leadership.

Some structured approaches may be more suitable than others depending on the type of project.  However, any structure (with leadership, governance and management in mind) is probably better than none.

 

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: agile, agile product development, DMAIC, lean manufacturing, lean six sigma, portfolio management, product life cycle process, program management, project governance, Project Management, Project Management Process, Project Planning Checklist, Project Schedule, Projects Planning, scrum, scrum master, six sigma

by Perry Parendo Leave a Comment

Robust Design with Monte Carlo Analysis

Robust Design with Monte Carlo Analysis

When an objective requires a tool to be used, that is idea. Certain projects can greatly benefit from use of Monte Carlo analysis. This in depth knowledge can create solutions where it is not readily apparent. If you are considering going this far, we can help you decide if the value is worthwhile. And we can help you apply it in a simple yet powerful way. [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

by James Kovacevic Leave a Comment

Taking a Lean Approach to PM Optimization

How You Have Your PMs Addressing The Right Issues, Make The Effective

In the previous articles, we looked at what type of analysis to use to evaluate the effectiveness of the PMs and if they are cost effective. Once the PMs have been optimized to ensure they are addressing the right failure modes, then they need to be made efficient. Below is an excerpt from a recent article in SMRP’s Solutions Magazine on how to make PM efficient using the lean tools.

[Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: lean, PM Optimization

by Greg Hutchins 2 Comments

Less is More

Less is More

Less is More – Efficiency in Project Management Plans

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

We’ve all seen it…a filing cabinet full of project management plans and procedures from the last job that people have tried to adapt and modify to meet the current project. Amazing that such a plethora can give the impression of effectiveness and, to a skeptic, surprising if they are relevant, read or assimilated. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 104
  • 105
  • 106
  • 107
  • 108
  • …
  • 215
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy