Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

All articles listed in reverse chronological order.

by Greg Hutchins Leave a Comment

Last Job Syndrome, The Risks of Project Past

Last Job Syndrome, The Risks of Project Past

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

We all use our work experience to a greater or lesser extent and often the most recent project is recalled as it is at the forefront of our minds.  However, is it the most relevant if we try to adapt our most recent, and hopefully successful, experience to meet the current situation? [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Plant compressed air waste control

Plant compressed air waste control

Plant compressed air waste control. Every compressed air system will eventually develop leaks from connectors and redundant pipelines. Compressed air is very expensive to make. It is necessary to institute regular inspections for air leaks and fix them immediately.

Keywords: pressure loss, energy loss, air compressor, pressure switch. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Christopher Jackson Leave a Comment

Small Satellites, Emerging Technology and Big Opportunities (part five of seven) – Stop solving the problem you want to solve

InnoCentive CEO Dwayne Spradlin wrote in this article about how many companies in a rush to develop something new and innovative try to solve a problem that they want to solve rather than the problem the customer wants to be solved. He quotes Albert Einstein who once said

If I were given one hour to save the planet, I would spend 59 minutes defining the problem and one minute resolving it.

[Read more…]

Filed Under: Articles, on Product Reliability, Reliability in Emerging Technology

by Doug Plucknette Leave a Comment

10 Things I Can Do Today To Improve Equipment Reliability!

10 Things I Can Do Today To Improve Equipment Reliability!

As companies around the globe look to improve equipment reliability I can’t help but think of the Technicians and Craftspeople I meet after a conference presentation. As they step up to introduce themselves to comment on the presentation some will often say “I really liked your presentation but I don’t think our management would ever support a program like this. What you are doing makes a lot of sense but we just don’t have the people and our operations managers don’t understand maintenance and reliability.” [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Perry Parendo Leave a Comment

Needs and How to use an Expert for your Project

Needs and How to use an Expert for your Project

Needs and How to use an Expert for your Project

Finding an expert for your project is important. Knowing what traits they need and how to employ them will lead you to improved opportunity for success. We at Perry’s Solutions, Inc. have these key traits and exist as a business because we are often being used in this role – previously as a corporate employee and now as a consultant. [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques

by James Kovacevic Leave a Comment

Why Do You Need An Asset Management Program?

Why Do You Need An Asset Management Program?

Understanding the Business Benefits of an Asset Management Program

Have you tried to upgrade / replace a piece of equipment due to the high cost of maintenance?  What about having the process stopped by procurement because they are not aligned with the high upfront cost?

While there is a generally a common goal of ensuring the long-term success of an organization, the approach is not always cohesive.  An asset management program is there to ensure an integrated and cohesive approach is in place.  This cohesive approach ensures the organization is working towards a common goal. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Asset Management Program

by Greg Hutchins Leave a Comment

City of Houston’s Risk Assessment Process

City of Houston’s Risk Assessment Process

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Houston Texas is one of the few local governments in the United States with an Enterprise Risk Management (ERM) based risk assessment approach. This policy was reviewed and updated in 2016.  This was the latest step in the city’s use of risk assessment.

From 1996 to 2004, the city outsourced risk assessment.  The assessment was performed every five years.  Beginning in 2009, the city’s audit department took over the assessment.  This article discusses the risk assessment process used by the City of Houston.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Metering & Dosing Pump Operations

Metering & Dosing Pump Operations

Metering and dosing pump operation. Any positive displacement pump can be used as a metering or dosing pump. The purpose of these pumps is to inject a known volume of liquid into a process stream. The primary requirement is that over a given period of time the pump consistently delivers the same amount of liquid. Keyword: gear pump, piston pump, helical rotor pump, diaphragm pump, peristaltic (hose) pump, additive, dosing rate. [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Robert Allen Leave a Comment

What is DFx?

What is DFx?

In a previous article, we defined design for six sigma (DFSS) as a thought process focused on maximizing customer value and minimizing cost.

More specifically, DFSS is used to reduce variability in product performance (thereby increasing value), using analytical models and our knowledge of manufacturing variability to enable specification limits on difficult-to-manufacture tolerances to be increased (thereby reducing cost).

[Read more…]

Filed Under: Articles, on Leadership & Career, Product Development and Process Improvement Tagged With: Critical to Quality, customer value, Design for Six Sigma, DFSS, DFx, New Product Development, PLC process, product development, product life cycle, Project Management, six sigma

by Adam Bahret Leave a Comment

Product Specification, Use Case, and Environment

Product Specification, Use Case, and Environment

The formal definition of reliability is …

“The probability that an item will perform its intended function under stated conditions, for either a specified interval or over its useful life.”

The three key terms in this statement are

  • Intended Function
  • Stated Conditions
  • Specific Interval

[Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Dennis Craggs Leave a Comment

Extended Bogy Testing

Extended Bogy Testing

Extended Bogy Testing

Introduction

Extended bogy testing builds on test to bogy (TTB), discussed in a prior article. TTB focused on calculating the number (N) of parts tested to one life bogy, with 0 failures allowed, to a specified reliability (R) and confidence (C) levels.

Using TTB to verify conformance to high reliability and confidence targets requires very large sample sizes, increasing testing cost. The capacity to test large samples may require large facility capital expenditures. Also, the zero failures allowed paradigm removes the opportunity to learn about product failure modes and the opportunity to improve the product through design or manufacturing process changes.

This article focuses on extended bogy test plans as an alternative to TTB.

[Read more…]

Filed Under: Articles, Big Data & Analytics, on Tools & Techniques

by Christopher Jackson Leave a Comment

Small Satellites, Emerging Technology and Big Opportunities (part four of seven) – Lets Learn about Reliability

Small Satellites, Emerging Technology and Big Opportunities (part four of seven) – Lets Learn about Reliability

Imagine you are not feeling well and you go to a doctor. When you sit down in the doctor’s office, he doesn’t even look at you. Instead, he has a book opened on the desk and starts reading it aloud. You sit there without being examined, listening to a list of medicines, activities, exercises and diet changes. The doctor then looks up and says that you need to do all of them. Take all the medicines. Change all your activities. Start doing all the exercises. And completely change your diet. [Read more…]

Filed Under: Articles, on Product Reliability, Reliability in Emerging Technology

by Perry Parendo Leave a Comment

Resolution II Design of Experiment Set Up Danger!

Resolution II Design of Experiment Set Up  Danger!

Design of Experiments classes always talk about Resolution III and higher designs. But what is a Resolution II design? We show what it is – and show that it is actually used quite a bit! Should be used with caution as it does not provide understanding.

www.PerrysSolutions.com [Read more…]

Filed Under: Articles, Experimental Design for NPD, on Tools & Techniques Tagged With: DOE

by James Kovacevic Leave a Comment

What is Asset Management?

What is Asset Management?

Understanding the Value of an Asset Management System

All stakeholders have different perspectives, and as a result, place value on different aspects of an asset.  Trying to balance all the requirements is not an easy task.  Whether the requirements are performance, cost, or the level of risk.  Keep in mind, that performance can not only be uptime or OEE, but the beauty of a park, or the condition of a road.  This is where asset management comes in. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: asset-management

by Greg Hutchins Leave a Comment

Just a Job Syndrome – Risk to Jobs Present

Just a Job Syndrome – Risk to Jobs Present

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

You’ve started a new project; or joined one that’s up and running or it’s nearing closure – and it’s going well.  With no problems to speak of, it’s business as usual; so stick to the plan and it will be all right in the end ‘cos nothing can go wrong.

Or perhaps there are problems; but all projects have problems!  It’s not your problem as the bid team, planning team, or those awkward stakeholders and ever present over demanding clients can be blamed.

The project will eventually get finished if it’s on, or off, the rails.  The project is ‘just a job’ and management just carry on clocking-in and clocking-out regardless of the situation. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 118
  • 119
  • 120
  • 121
  • 122
  • …
  • 215
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy