Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

All articles listed in reverse chronological order.

by Fred Schenkelberg Leave a Comment

First Five Questions

First Five Questions

ASQ has posted sample exams for the past 10 or so years for the certifications. The CRE one is from 2009 and has questions used on previous exams. You can find a copy here or here.

This post has the first 5 questions with the answers explained. This is how I think or work through the problem to select an answer. Please comment if you have a different approach, especially if it would save time. [Read more…]

Filed Under: Articles, CRE Prep, CRE Preparation Notes Tagged With: cre prep

by nomtbf Leave a Comment

Replacing MTBF with Bx

Replacing MTBF with Bx

A Guest Post by Jim McLeish titled:

Replacing MTBF/MTTF with Bx/Lx Reliability Metrics 

Jim McLeish – Mid-West Regional Manager – DfR Solutions
(Rochester Hills Michigan)

jmcleish@dfrsolutions.com

http://www.linkedin.com/in/jimmcleish 

Expanded from the RIAC Reliability Information Analysis Center Linkedin Group Discussion on

“Great challenge for change from Fred – No MTBF!”

“Endless discussion and it seems there’s no real solution to get rid of MTBF”

See original and ongoing Linkedin discussion here.

 

I am absolutely astonished that the reliability profession and its noted experts are unable to develop a better metric to characterize reliability performance and specify reliability requirements.  I respectfully submit that there is a simple and eloquent solution that has successfully been used in the ball bearing and machine industry for decades (that actually predates MTBF/MTTF), that should be considered as a replacement to MTBF/MTTF. [Read more…]

Filed Under: Articles, NoMTBF Tagged With: popular

by Fred Schenkelberg Leave a Comment

Reliability Goal Story

Reliability Goal Story

A life-support-equipment company manager desires to conduct a reliability program assessment. The company is experiencing about a 50% per year failure rate and at least the Director of Quality thought it should do better. One of the findings was related to reliability goal setting and how it was used within the organization.

Nearly everyone knew that the product had a 5,000-h Mean Time Before Failure (MTBF) reliability goal, but [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: goals, measures

by Fred Schenkelberg Leave a Comment

Reliability Maturity Matrix

Reliability Maturity Matrix

The concept of a maturity model is not new. It provides a means to identify the current state and illuminate the possible improvements to a reliability program. The matrix serves a guide to assist an organization in improving its program.

The matrix has five stages. In general, the higher stages are most cost effective and efficient at achieving higher rates of product reliability performance. These stages—uncertainty, awaking, enlightenment, wisdom, and certainty—are described in today’s post. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Maturity matrix, team

by nomtbf Leave a Comment

Someone had to do it

Take on MTBF, that is.

In a conversion with a colleague I mentioned the amount of traffic the NoMTBF site has been enjoying. For what started simply as a device for a discussion, the No MTBF movement has turned into quite an endeavor. We talked about the idea that unless someone starts and stays with the effort, MTBF will continue to erode the credibility of reliability engineering. We talked about the idea that unless we started the discussion to only use MTBF when it is proper to do so, that we would be plagued by the rampant misunderstanding and misuse for decades to come.

[Read more…]

Filed Under: Articles, NoMTBF

by Fred Schenkelberg 2 Comments

Hypothesis Test Selection

Hypothesis Test Selection

Over the past few weeks, we have explored about 8 different hypothesis test formulas. There are more. So, how do you determine which test to perform? Well, that depends on the question you are trying to answer and the type of data you’re dealing with. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: hypothesis test, Hypothesis Testing (parametric and non-parametric)

by Fred Schenkelberg Leave a Comment

Decision Focus

Decision Focus

An essential element of a successful reliability program is the notion that all reliability activity relates to decisions. If you are performing a HALT because it is listed in the product development guidelines, or because it was carried over from the last program’s plan, and the HALT results are not part of the design improvement decision-making process, then you probably should not be doing so. If the HALT results yield little or no information (e.g., it is just being checked off the list as accomplished) then the HALT itself provides little or no value. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: design

by Fred Schenkelberg Leave a Comment

The Paired-Comparison Hypotheses Test for Variances

The Paired-Comparison Hypotheses Test for Variances

The F-test provides a means to compare paired data variances. It is a variance hypothesis test.

If we are exploring the precision of one measuring device or another, or we are comparing assembly processes, we often want to know if the variance is different or not.
Working with data from normal distributions from two different processes or devices, we know from statistical theory that the ratio (s1)2 / (s2)2 is described by the F distribution.
There are three hypothesis test possible, basically to test if the population variances are different, or one is less than or greater than the other. The following details the three test’s null and alternative hypotheses. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: hypothesis test, Hypothesis Testing (parametric and non-parametric), Variance

by Fred Schenkelberg Leave a Comment

Product Reliability Participants part 7

Product Reliability Participants part 7

This will be the last of the series, considering the different positions in an organization that deals with product reliability. We’ve moved away from the positions where the focus on reliability is central, but there are important considerations in relation to product reliability for each of these roles still. In this concluding post the subjects are the manufacturing team, and field service and call center staffs. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: team

by Fred Schenkelberg 3 Comments

CRE Calculator

A key preparation step for the CRE exam is to have and know how to use a simple calculator. I use my smartphone and a calculator app – and I would not be permitted to use the phone during the exam. Same with tablets, computers, and other common tools that we now take for granted. [Read more…]

Filed Under: Articles, CRE Prep, CRE Preparation Notes Tagged With: cre prep

by Fred Schenkelberg Leave a Comment

Product Reliability Participants part 6

Product Reliability Participants part 6

In this installment of the series dealing with the myriad participants within an organization, we’ll start with failure analysis specialists, before moving to marketing and sales, and finally getting to the finance team. We’re moving away from the positions where the focus on reliability is central, but there are important considerations in relation to product reliability for each of these roles still. The next post in this series will be the final one. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Product Reliability, team

by Fred Schenkelberg Leave a Comment

Chebyshev’s Inequality

Chebyshev’s Inequality

As with the Markov Inequality, we may find useful information from a list of values, say time to failure data. Again, none of the numbers may be negative for this to apply, yet with life data that is rarely the case.

Short on time- a common situation for reliability engineers; we have only the mean, standard deviation and number of values in a list. And, we need to say something about the data and the number or fraction of value above a specific value. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Basic Probability Concepts

by Fred Schenkelberg Leave a Comment

Markov Inequalities

Markov Inequalities

If we have a list of numbers, saw cycles to failure for a test. None are negative. And, we do not have time for a complete analysis before being asked about the results.

What can we do?

In this case, the Markov Inequality may prove useful for a quick assessment of the results. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Basic Probability Concepts, Summary Statistics

by Fred Schenkelberg Leave a Comment

Product Reliability Participants part 5

Product Reliability Participants part 5

Continuing the series where we examine various roles within an organization and the ways in which each role interacts and affects product reliability, this post will start off with procurement engineers and managers. Since each role hereafter is a bit less involved, multiple roles will be grouped together. After procurement, we’ll take a look at warranty managers. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Product Reliability, team, warranty

by Fred Schenkelberg Leave a Comment

Product Reliability Participants part 4

Product Reliability Participants part 4

The last post moved into the role of quality and reliability engineers, and the influence that leadership in design and product development has on the product reliability process. Similarly, this post will move to Q & R managers, again looking at the role of that position in relation to product reliability.

[Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: product development, Product Reliability, Reliability Manager, team

  • « Previous Page
  • 1
  • …
  • 204
  • 205
  • 206
  • 207
  • 208
  • …
  • 215
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy