Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » Page 216

Articles

Find all articles across all article series listed in reverse chronological order.

by Adam Bahret Leave a Comment

Old Requirements Making a Come Back in Future Endevours

Old Requirements Making a Come Back in Future Endevours

The original windmills of Europe are feats of engineering.  I was able to get inside of a few in Holland and see all the mechanisms that have been operating for hundreds of years.  I was lucky that the wind was strong and the windmills had their sails out the days I was visiting.  A few were grinding flax seed and others designed to pump water from a low basin toIMG_5885 a high basin to control basin water levels. Being inside of the windmill was like being an insect inside of a grandfather clock.  It was so interesting seeing how they engineered the mechanisms to optimize the balance of the system needs in such a different manner than we do with many of our currently engineered products. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Greg Hutchins 2 Comments

Why Don’t We Listen?

Why Don’t We Listen?

Guest Post by Umberto Tunesi (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Or, why we are not listened to?

Why don’t we listen to those who – justifiably – cry wolf?

Be others or ourselves, it does not matter.

The output of this regrettable way of thinking often results in a “chronicle of a death foretold”.  What do I mean? [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini 1 Comment

Experiences with Pneumatic Actuators

Experiences with Pneumatic Actuators

What readers will learn in this article.

  • How pneumatic actuators work.
  • Air pressure requirements for proper operation.
  • Air supply piping installation requirements.
  • Air quality requirements for long life operation.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance Tagged With: Valves

by Fred Schenkelberg 3 Comments

10+ Dropped Items from the ASQ CRE Body of Knowledge

10+ Dropped Items from the ASQ CRE Body of Knowledge

A Review of the 2018 ASQ CRE Body of Knowledge

I just noticed the new 2018 ASQ CRE Body of Knowledge had been posted on the ASQ site. The new BoK will be in effect for CRE exams as of January 2018. Thus, we have six months to adjust to the new body of knowledge.

This is part 1 of a multipart review of the new BoK. Here we’ll look at the parts that those preparing for the exam will not have to master or review. There are 10+ topics dropped completely or in part from the BoK.

In future articles, we’ll review what has been added, what has been changed (a review), and how to best prepare for exams based on the new BoK. Plus, we can look over past BoK’s to understand where reliability engineering practice is today.

In part, the logic is these sets of tools (topics) that are not widely used by working reliability engineers. In some cases, I agree, and in others, I don’t. Let’s look at the eight topics not found in the upcoming CRE BoK. [Read more…]

Filed Under: Articles, CRE Prep, CRE Preparation Notes

by Anne Meixner 1 Comment

What Makes Memory Test Hard

What Makes Memory Test Hard

Just One More Thing

Memory circuits store 1’s and 0’s for you so that you can retrieve them later. The 1/0’s can represent data or instructions.

Today, no computing device operates without some memory. Memory devices store pictures, music, documents. How many USB (Unified Serial Bus) memory sticks do you have scattered on your desk?

Semiconductor memory comes in many flavors: Dynamic Random Access Memory (DRAM), Static Random Access Memory (SRAM), Read Only Memory (ROM), Erasable Programmable Memory (EPROM), NAND/NOR Memory (a.k.a. Flash), Solid State Drive (SSD). Without power volatile memories like SRAM and DRAM lose their stored values. Non-Volatile memories retain their stored value when power is absence. [Read more…]

Filed Under: Articles, on Tools & Techniques, Testing 1 2 3 Tagged With: Stuck at Fault Model, VLSI Test

by Fred Schenkelberg 1 Comment

Listening Skills for Reliability Engineers

Listening Skills for Reliability Engineers

Listening Skills to Improve Your Ability to Communicate with Influence

Did you hear what they said? Or, were you busy loading for your next verbal barrage?

As my mother would remind me, one should listen twice of often as speaking. Something about the ratio of ears to mouths in the population. I have to agree with her, that one can learn a lot by listening.

Listening may not seem to be a skill that one needs to master. Yet, how often have you walked away from a meeting where one or more participants obviously were not listening? How often are points repeated in an effort to be heard?

Being able to listen, listen well, can be honed and improved. A focus on being a better listener will improve your ability to communicate and influence as a reliability engineer. It has benefits beyond our reliability work, too. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: Influence, Listening

by Doug Plucknette 1 Comment

Why Do You Need Reliability Centered Maintenance?

Why Do You Need Reliability Centered Maintenance?

I had a conference call this morning with some potential clients in regard to rolling out a RCM Blitz™ effort. The sad thing about Reliability Centered Maintenance is the reputation the tool has acquired over the last 40 years has one of two faces.

The sad, tragic and more popular face is that if the Resource Consuming Monster. The reputation that RCM is too detailed, that it takes too long, and that by the time you finish your analysis there are no recourses and there is no money left for implementation. According to a survey conducted on ReliabilityWeb.com nearly 70% of all RCM implementations fail, with statistics like this, it is a wonder the tool still exists. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz Tagged With: Reliability Centered Maintenance (RCM)

by James Kovacevic 1 Comment

Unlock the Efficiency of Your Planner with a Single Step: BOMs

How Bill of Materials (BOMs) Can Exponentially Increase the Efficiency of Your Maintenance Planner

BOMs - Siemens PLM
Image by Siemens PLM Software

Imagine a world where the Maintenance Planner can quickly and easier find all the material information for each job. Even those that do not yet have a job plan. Dreams or reality? Reality. This reality is found within operations all over the world and you can have it too. How can you achieve a level of efficiency with your Planner and have all materials information readily available? With Bills of Material.

A Bill of Material or BOM as it is commonly referred to, is a list of material needed to support the operations and maintenance of an asset or component. It includes a part description, part number and how many are required on a specific component or assembly. It may also include a reference number that refers to a sub assembly drawing. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

by Mike Sondalini Leave a Comment

The CMMS* User

The CMMS* User

Written instructions make it clear.

Written directions given to maintenance tradesmen to reduce the chance of making an error and to reduce time spent looking for information are called job procedures or job instructions.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Greg Hutchins Leave a Comment

Are You Managing Risk or is it Managing You?

Are You Managing Risk or is it Managing You?

Guest Post by Paul Kostek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

You’ve completed your project’s Risk Management Plan and now you can move forward with project execution because all of the project’s risks have been identified what can go wrong?  Well plenty.  It’s easy to get caught up in weekly (daily) reviews of the identified risks, tracking status (are the boxes going green, yellow, oh no red?). [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Fred Schenkelberg 4 Comments

The Eyring Model

The Eyring Model

The Eyring Model for Accelerated Testing

Sometimes the reaction rate of a process relies on two stresses. For chemical reactions, temperature seems to influence the rate of the reaction. Yet, other stresses such as humidity or voltage may also play a significant role.

H. Eyring suggested a model that assumes the contribution of each stress on the reaction rate is independent; thus one could multiply the respective stress contributions to the rate of reaction.

The Eying model provides a means to account for the contributions of temperature and another stress when modeling the time to failure of select failure mechanisms. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Testing Tagged With: Life testing and accelerated life testing (ALT)

by Anne Meixner Leave a Comment

Digital Circuits and the Stuck at Fault Model

Digital Circuits and the Stuck at Fault Model

Fault_equivalence_example

Semiconductor Integrated Circuits (ICs) can have millions of digital circuits which can translate to billions of transistors.

I know these numbers can be intimidating, but I assure you the challenges of testing ICs started in the mid-late 1970’s.  Lots of effort has been put into Electronic Design Automation (EDA) systems and Design for Test (DFT) techniques to manage the development and application of digital circuit testing.

In the beginning these software programs and DFT techniques used the Stuck at Fault Model. [Read more…]

Filed Under: Articles, on Tools & Techniques, Testing 1 2 3 Tagged With: Digital Test, Stuck at Fault Model

by Dennis Craggs Leave a Comment

Switch Verification

Switch Verification

Customer Usage Switch Verification

Here is an example of a common engineering development task. A design engineer needed a life test plan for a switch verification in a safety system. We jointly developed a plan by taking a system view of the component function, considered corporate and regulatory requirements, customized it to the supplier’s test capabilities, executed the plan, and made design changes to remove product defects. [Read more…]

Filed Under: Articles, Big Data & Analytics, on Tools & Techniques Tagged With: Statistics distributions and functions

by Fred Schenkelberg Leave a Comment

Writing Skills

Writing Skills

Technical Writing Skills for Reliability Engineers

Your peers, team mates, and management want to understand your writing. They want to quickly get your point, find supporting information, and take action.

As a reliability engineer, you write proposals, plans, and reports. You write problem statements, failure analysis findings, recommended process improvements, and much more.

You write to document a process or plan. More often you write to encourage others to take action.

Writing clear, concise missives the incite action is a hallmark of a good reliability engineer. You are doing technical writing.

You can learn to write well. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

by Doug Plucknette Leave a Comment

Dealing With a Bully Boss!

Dealing With a Bully Boss!

The following article came about from an on-line conversation I had with a follower who responded to an article I had written on the differences between Leaders and Managers.  Her hope was that someday soon someone in a leadership position at her company would recognize the harm her boss was causing and how miserable he had made the lives of those who worked for him. 

So as promised here is my take on working for a bully boss!
If you’re lucky you only work for one in your lifetime. [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

  • « Previous Page
  • 1
  • …
  • 214
  • 215
  • 216
  • 217
  • 218
  • …
  • 268
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • The Truth About RCM Facilitators: Responsibilities Revealed
  • Reliability Sample Size P3 with failures using Binomial Distribution
  • Learn to Notice MTBF Every Day
  • Back to the Basics: Calibration vs. Verification
  • Flight of Shadows

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.