Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

All articles listed in reverse chronological order.

by Greg Hutchins Leave a Comment

Red Flags? They are All Red Flags

Red Flags? They are All Red Flags

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

“That’s a Red Flag!” goes the cry from some when something amiss is recognised.  However, many project participants don’t realise that their Project sails through a sea of flags and that, on some occasion, the flags can be read as red by somebody at some time.

In a similar nautical vein the Roman writer Ovid once poetized “The man who has experienced shipwreck shudders even at a calm sea“.  While written some 2,000 years ago it is as true today as it ever was and a reminder to us all that risks lurk everywhere.  Some risks may not be identified, let alone assessed and may go unnoticed until they strike.  We need to be aware and vigilant and avoid a complacent belief that a risk register is the be all and end all.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Larry George Leave a Comment

What’s Wrong Now? Multiple Failures?

What’s Wrong Now? Multiple Failures?

How is failure testing done on the Space Station? Could FTA (Fault Tree Analysis) be used in reverse to detect multiple failures given symptoms? That’s what NASA was programming in the 1990s. I proposed that the ratios P[part failure]/(part test time) be used to optimally sequence tests. Those ratios work if there are multiple failures, as long as failure rates are constant and failure times are statistically independent. 

[Read more…]

Filed Under: Articles, on Tools & Techniques, Progress in Field Reliability?

by Nancy Regan Leave a Comment

Are your Asset Management efforts worth your TIME?

Are your Asset Management efforts worth your TIME?

What does asset management have to do with TIME? Everything.

My mentor, John Moubray, taught me that our most valuable resource is TIME. Time is WAY more valuable than money. 

How you spend your TIME determines IF and HOW your asset management efforts will pay off. In other words, will your efforts help you achieve the kind of equipment Reliability you’re looking for?

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

by Sanjeev Saraf Leave a Comment

OSHA Chemical NEP

OSHA Chemical NEP

On July 27, 2009 OSHA launched its National Emphasis Program (NEP) targeted at chemical facilities. The NEP will operate as a one-year pilot program during which OSHA will conduct planned inspections of chemical facilities.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Robert (Bob) J. Latino Leave a Comment

So how Should I use the SAP-PM Breakdown Indicator?

So how Should I use the SAP-PM Breakdown Indicator?

Guest post by Ken Latino.

There are many opinions about the use of the breakdown flag in SAP-PM. I would like to offer my opinion on this debate. First, I do not like the term “breakdown”. With a name like breakdown, nobody will want to check the box! No one likes to admit that a something has failed or is broken. I wish the field were named “reliability event” to take away this negative connotation.  I will discuss this in more detail later.

[Read more…]

Filed Under: Articles, on Systems Thinking, The RCA

by Mike Sondalini Leave a Comment

Cheap Way To High Pumping Circuit Availability

Cheap Way To High Pumping Circuit Availability

Using Reliability Principles for a Cheap Way To High Pumping Circuit Availability. High plant availability is achieved by having redundant equipment that can be brought on-line as soon as the operating unit has failed. Redundancy is expensive as there are two items to buy, two to install and two to maintain at full operating capacity. There is an alternate option for maintaining high pumping circuit availability by designing quick methods to bring mobile equipment into the circuit when pumps are down. This article explains how to set-up piping for a mobile pump to maintain operation when the normal duty pump is out of use.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Greg Hutchins Leave a Comment

Email @50 Years – Blessing or Risk

Email @50 Years – Blessing or Risk

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Email is 50 this year…its Golden Anniversary!  It ‘happened’ in 1971 when Ray Tomlinson, the late computer engineer and first user, sent a transmission to himself utilising two independent computers…a revolutionary innovation at the time.  The content of that primordial message is long forgotten and the same may also be the fate of many of the ~300 billion emails that are sent almost every day by the estimated 4 billion users around the world.  Communication is said to bring us together or set us apart and email is no different.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Ray Harkins Leave a Comment

Sharpening the Axe – Developing a Process Inspection Plan

Sharpening the Axe – Developing a Process Inspection Plan

Abraham Lincoln taught the value of adequate preparation when he said, “Give me six hours to chop down a tree and I will spend the first four sharpening the axe.” By training, quality professionals are often focused on verifying the correctness of a product. A traditional inspector at the Lincoln Timber Company might have dutifully marked in her audit log the date and time, the type and size of tree, followed by the comment, “Cut down.”

But Honest Abe would have advised her to take a closer look at the tools and process used to complete the job.

[Read more…]

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

by Sanjeev Saraf Leave a Comment

Terrorism Risk: Years After 9/11 Is Your Organization More Or Less Vulnerable To Terror Threats?

Terrorism Risk: Years After 9/11 Is Your Organization More Or Less Vulnerable To Terror Threats?

Years after 9/11 threat of terrorism continues to persist. Organizations buying insurance to provide protection from terror attacks is on the rise.

Terrorism Insurance

Prior to 9/11, there was terrorism insurance was not a major concern. However, after 9/11 insurance and reinsurance companies found themselves with significant amount of exposure. Immediately following 9/11, insurance companies were refusing to provide terrorism insurance or providing it at a very high premium to high risk facilities.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by John Kreucher Leave a Comment

ALT Design using Damage Bins

ALT Design using Damage Bins

The Arrhenius Equation is widely used and accepted by reliability and validation engineers from many industries to develop accelerated life tests (ALT) for thermal aging environments.  

The general form of the equation describes the reaction rate of a process as a function of temperature (K), the Boltzmann constant (8.617E-5 eV/K) and two empirical factors.  It can be written as:

[Read more…]

Filed Under: Articles, on Product Reliability, Product Validation

by Greg Hutchins Leave a Comment

Too Big to Fail – Suez Canal Risks

Too Big to Fail – Suez Canal Risks

Guest Post by Geary Sikich (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

The Ever Given grounding in the Suez Canal is one of those events that will be labeled a “Black Swan” for sure.  A rouge wind hits the ship turning the stern and wedging the vessel, bow and stern grounded straddling the canal and stranding ships entering from either end.  The date Tuesday 23 March 2021.  At around 7.40 a.m. local time the Ever Given ran aground.  At nearly 200 feet wide and 1,300 feet long, it easily took up the width of the channel.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Getting High Equipment Reliability

Getting High Equipment Reliability

These are the slides from Mike’s conference presentation at the SIRFRt CM & Lube Forum 2008 Conference.

[Read more…]

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

by George Williams Leave a Comment

Maintenance Infographic

Maintenance Infographic

Maintenance, failures, design for reliability, use of RCM and predictive technologies explained in infographic. Leave some feedback so we can make it better.

[Read more…]

Filed Under: Articles, on Maintenance Reliability, ReliabilityXperience

by Larry George Leave a Comment

What’s Wrong Now? Shotgun Repair

What’s Wrong Now? Shotgun Repair

Shotgun repair is trying to fix a system problem by replacing parts until the problem goes away. It is often done without regard to parts’ age-specific reliability information. Should you test before replacement? Which test(s) should you do? In which order? How long? Which part should you replace next if the test gave no indication of what’s wrong? What if test indication is imperfect or the fault is intermittent? What if there are more than one part failure?

[Read more…]

Filed Under: Articles, on Tools & Techniques, Progress in Field Reliability?

by Nancy Regan Leave a Comment

How I applied all seven steps of Reliability Centered Maintenance

How I applied all seven steps of Reliability Centered Maintenance

How I applied all seven steps of Reliability Centered Maintenance (RCM) on my drive home from the Reliable Plant Conference

I just can’t seem to get away from Reliability Centered Maintenance (RCM).

(And that’s okay with me. After all, my (technical) heart and soul belong to RCM!)

I was driving home from Indianapolis, Indiana after speaking at the Reliable PlantConference ~ 399 miles.

[Read more…]

Filed Under: Articles, Everyday RCM, on Maintenance Reliability

  • « Previous Page
  • 1
  • …
  • 20
  • 21
  • 22
  • 23
  • 24
  • …
  • 215
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy