Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Articles » Page 224

Articles

Find all articles across all article series listed in reverse chronological order.

by Greg Hutchins Leave a Comment

Making Decisions That Work For You!

Making Decisions That Work For You!

Guest Post by Ed Perkins (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

There is a lot of literature written on decision making, ‘how to’, best practices, process, factors and so to follow to make ‘good’ decisions.  We have been exploring ‘risk based’  decision making in these blogs.  We have looked at factors, process, frameworks, psychology and bias.

But we have not discussed perhaps the most important aspect of any decision – implementation or that double edged word ‘execution.’  (Of course this assumes that the decision maker wants something to actually happen as a result of the decision, but that is a topic for another day).

Let’s use the nicer word – Implementation – which implies there is a course of ACTION, with a timeframe for results to be produced or to occur. [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety Tagged With: Decision making

by Mike Sondalini 1 Comment

Heating Liquids by Steam Sparging

Heating Liquids by Steam Sparging

Steam is often used for heating liquids. Heat is provided to a liquid either through a heat exchanger or by direct injection of raw steam. The injection of steam directly into the process is known as steam sparging. The sparge design and location affect the efficiency of the process.

Keywords: boiling, heating water, temperature increase, injector, lance, boiler pressure, properties of steam.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Fred Schenkelberg Leave a Comment

Uncertainty and Risk Management

Uncertainty and Risk Management

We are rather good at being surprised when setting expectations for the future. This is the essence of risk. The difference between what we expect to occur or would like to occur, and what does occur.

The definition of risk in ISO 9000:2015 and ISO 31000 include the phrase “ effect of uncertainty”. Let’s remove some of the uncertainty around the term uncertainty in the context of risk and risk management. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management

by Adam Bahret 1 Comment

A video of the great grandchild of the product of the first HALT

A video of the great grandchild of the product of the first HALT

I don’t know if you recall a post from my blog, “HALT Testing is Not Always In a Chamber”,  that discussed what I consider to be the first documented HALT test.  Well I just found a video of the design solution in action and it is super cool. I discussed how during Screen Shot 2017-03-27 at 9.20.50 AMthe development of the F1 rocket motor, for the Apollo space program, they solved a design issue with a HALT technique, although they didn’t call it HALT at the time.  The issue they were attempting to solve was the thrust nozzles fracturing due to oscillating vibration. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability

by Kevin Stewart 1 Comment

Short Term Reliability Focus Challenge

Short Term Reliability Focus Challenge
I read an interesting article from Heinz P. Bloch entitled “6 Successful Strategies for the Not So New Challenges of Today”, which is available at Reliability Web.  Heinz has been around for many years, and I suspect that his readers have heard him speak or read most of his articles.  In my opinion, his insights have always been spot on and based on time-tested blocking-and-tackling, using simple techniques.  In the article, he started out with the following:

[Read more…]

Filed Under: Articles, on Tools & Techniques, Reliability Reflections

by Doug Plucknette Leave a Comment

4 Differences Between Leaders & Managers

4 Differences Between Leaders & Managers

While working in the field of Asset Management formerly known as Maintenance and Reliability for over 30 years I have worked with my share of Managers and Leaders.  Those who have known me for years know that I started in the field as a Pipefitter Apprentice, worked as a Journeyman and Team Leader for a number of years, did a stint as a Maintenance Supervisor, went to night school to become a Reliability Engineer and then as a business owner working with customers around the world.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by James Reyes-Picknell Leave a Comment

Increase Productivity and Competitiveness with MRO Technology – Part 1

Increase Productivity and Competitiveness with MRO Technology – Part 1

In search of excellence in MRO Materials Management (indirect materials / spare parts), I have noticed two curious facts.

First, even in developed countries, industrial companies and providers of ERPs (enterprise management systems) are technologically very backward in this specialty.

Second, those very little companies or experts who developed differentiated technology keep it safe guarded as a trade secret.

This exposure results in considerable accumulation of knowledge and expertise, and a unique set of observations and conclusions which certainly could not fail to be shared with the concerned community.  [Read more…]

Filed Under: Articles, Conscious Asset, on Maintenance Reliability Tagged With: Maintenance program

by James Kovacevic 2 Comments

The 5 Levels of Maintenance Scheduling

airline schedule board
Photo by Qfamily

Making Maintenance Scheduling Simple

Coordinating all of the maintenance activities within a site can be overwhelming. A schedule is supposed to help reduce the sense of being overwhelmed. But why is it that when trying to pull together a schedule for the next shift, day or week, it always seems to be a mad dash?

Often times the maintenance scheduling process is not well defined or thought out, and this leads to being overwhelmed. It also projects an image to our operational partners that we do not have our house in order. This image may or may not play a role in having our Maintenance windows moved or cancelled, further our scheduling issues. [Read more…]

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability Tagged With: Maintenance scheduling

by Greg Hutchins Leave a Comment

How Well Do Risk Assessments Inform Decision Makers?

How Well Do Risk Assessments Inform Decision Makers?

Guest Post by Chris Peace (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Sometimes, it seems that every newspaper edition, news broadcast or news website carries yet another story about a disaster – an event that might have been avoided by better decision making.

But do we ask whether such decisions were informed by risk assessments?  And if so, how effective were those risk assessments for informing the decision makers about the risks?  Which techniques were used in the risk assessments? Were the results presented in a way that made sense to the decision makers?  Do risk assessors follow a good process and so achieve some consistency in results, or do they just get lucky? [Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Mike Sondalini Leave a Comment

Differential Pressure Transmitters

Differential Pressure Transmitters

The differential pressure transmitter (PT) is used to detect a head of pressure.

The sensing element is connected to the process by pipework and flexes in proportion to the pressure. The resulting distortion produces an electric signal that is amplified and converted to a value on a read-out.

Keywords: pressure sensor, strain gauge, tank level, process pressure, pressure difference.  [Read more…]

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

by Adam Bahret Leave a Comment

Seminar: HALT Techniques and connecting to program objectives

Seminar: HALT Techniques and connecting to program objectives

This is the third session from the Annual Apex Ridge Reliability Seminar held in Boston.

In this session, I discuss the methodology of HALT and how to connect it with program tools and objectives.

The philosophy of HALT is often misunderstood simply due to its name and acronym, “Highly Accelerated Life Testing” (HALT).

It is not an accelerated life test, it’s really not even a test. HALT is a process of increasing stress on a design to induce failures for the purpose of learning about the design and improving its robustness.

It’s a discovery process. [Read more…]

Filed Under: Apex Ridge, Articles, on Product Reliability Tagged With: Highly Accelerated Life Testing (HALT)

by Fred Schenkelberg 2 Comments

The Connection of Reliability and Customer Expectations

The Connection of Reliability and Customer Expectations

Customers Experience Product Reliability in Real Time

In a customer’s mind, the product works or it doesn’t. If it doesn’t work as expected it has failed. This may or may not be a reliability problem.

A customer or someone using your product brings a set of expectations to the experience. The range of expectations may range from very little to very high functioning, value production, and durability.

Failures are defined by customers.

In part, this is the functional capability, the operating within specifications, and the durability. The customer’s definition of reliability may or may not follow the design specifications.

It is the comparison of what should happen to what does happen. [Read more…]

Filed Under: Articles, CRE Preparation Notes, Reliability Management Tagged With: Customer and market analysis

by Kevin Stewart Leave a Comment

What Do You Do with Your Reliability Opportunity?

What Do You Do with Your Reliability Opportunity?

The Opportunity

Here is a diagram I generated when I was in the reliability group at my facility.

It came about because I was trying to identify why we may not be showing the value that was expected from the reliability improvement work we were doing. [Read more…]

Filed Under: Articles, on Tools & Techniques, Reliability Reflections Tagged With: Maintenance program

by Doug Plucknette 1 Comment

Safety Is a Lifestyle

Safety Is a Lifestyle

Something to think about in a day and age when most companies post their mission, vision, and goals on the company web page.

Do we really stand behind these statements and demonstrate the behaviors that clearly show we are willing to do what it takes to create a safe workplace?

If you have ever questioned this, consider two questions I ask RCM Teams as we analyze failure modes that impact health, safety, and environment: [Read more…]

Filed Under: Articles, on Maintenance Reliability, RCM Blitz

by Fred Schenkelberg Leave a Comment

Use and Environmental Profiles

Use and Environmental Profiles

Use and Environmental profiles

Did you know that hot air doesn’t rise when there is no or very little gravity?

The electronics used to steer an oil exploration drill head 5 miles deep in the earth experiences 200°C sulfuric acid immersion along with continuous 50,000G shocks.

I used to think the environment under the hood a car was difficult. [Read more…]

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

  • « Previous Page
  • 1
  • …
  • 222
  • 223
  • 224
  • 225
  • 226
  • …
  • 268
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • The Truth About RCM Facilitators: Responsibilities Revealed
  • Reliability Sample Size P3 with failures using Binomial Distribution
  • Learn to Notice MTBF Every Day
  • Back to the Basics: Calibration vs. Verification
  • Flight of Shadows

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.