Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg Leave a Comment

Case Study: Creating a Spare Parts Purchase List with Confidence

Case Study: Creating a Spare Parts Purchase List with Confidence

Guest Author: Jason Ballentine, VP of Engineering for ARMS Reliability

Starting from Scratch with Spares

As anyone with a hand in running a household knows, it’s important to keep a stockpile of key items. You certainly don’t want to find out the hard way that you’re on your last square of toilet paper. But in the case of a facility like a power plant, a missing spare part could be more than just a nuisance—it could be downright expensive.

Determining the appropriate spare parts to have on hand in a large facility, however, can be tricky. This is especially true after building a facility from the ground up, when you don’t have a frame of reference for which spare parts you’re most likely to need first.

Most organizations deal with this in one of two ways:

  1. they guess or
  2. they purchase according to a spares list provided by an equipment vendor.

A Reliability-Focused Purchase List

There are obvious limitations when it comes to guesswork—making the wrong guess can result in huge expenses either in unnecessary spare parts or in costly downtime. A vendor-suggested list is probably somewhat more accurate, but such suggestions are unlikely to take into account the specific needs of your organization. We approach spare part holding recommendations through the lens of reliability as it applies to each specific operation. As factors change, it’s important to re-evaluate, making sure to take into account everything that could influence purchase priorities.

Recently, a utility company approached us to review the list of spare parts their equipment vendor had recommended. According to the vendor, this utility needed to purchase $4.9 million worth of spare parts up front. The utility wanted a second opinion before making such a sizable investment.

Our Approach

We started the spare parts analysis by looking at the list provided by the equipment vendor, but then we dug much deeper. We explored a series of questions, including: How often is this part likely to fail? What is the cost of the downtime if the part is attached to a critical piece of equipment? What is the unit cost of the spare part? What is the lead time to obtain a spare? Is this part likely to fail at any time throughout its lifecycle, or is it only likely to fail at the end of its life? There is no point in purchasing a spare today if you are unlikely to need it for another 20 years.

In all, about 1,500 pieces of equipment were reviewed over 40 days before providing a recommended list of spares. The final list included some of what the vendor had recommended, left off many of the vendor’s recommended parts, and suggested a few additional parts that weren’t in the original list.

The final critical spares list that was recommended included a total of $2.2 million in spare parts—a savings of $2.7 million over what the vendor had originally recommended.

Built to Adapt

Our recommended spares list is intended to be responsive to changing needs and new information. When the utility took a second look at its downtime cost and calculated that it was actually $10/megawatt and not the $23/megawatt they had initially determined, we re-evaluated the spares list, reducing the utility’s recommended purchases by another $200,000.

Conclusion

If your organization is like most, you probably run into trouble when it comes to having the right spares on hand. Either you’re missing the right parts when something breaks down, or you have expensive spares gathering dust and potentially going bad in storage. ARMS Reliability takes the guesswork out of developing a critical spares list, taking into account item costs, the likelihood of failure, lead times, downtime costs, and all other relevant factors.

The investment this utility made to conduct the analysis with our help ultimately reduced their bottom line equipment costs by $2.7 million—which represented a savings of 50 to 1. Beyond the monetary benefit, the utility’s Reliability Engineer felt much more confident in the approach taken. He was also relieved to avoid grossly overspending on spares.

 

Filed Under: Articles, Guest Articles

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« 5 Tips to Kick-Start Continuous Improvement Implementation
Living in VUCA Time »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy