Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

City of Houston’s Risk Assessment Process

City of Houston’s Risk Assessment Process

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Houston Texas is one of the few local governments in the United States with an Enterprise Risk Management (ERM) based risk assessment approach. This policy was reviewed and updated in 2016.  This was the latest step in the city’s use of risk assessment.

From 1996 to 2004, the city outsourced risk assessment.  The assessment was performed every five years.  Beginning in 2009, the city’s audit department took over the assessment.  This article discusses the risk assessment process used by the City of Houston.

Preparation

ERM is the basis for developing the annual audit plan. The development of the plan starts with the auditor taking the following steps:

  1. Update the number of areas which need to be audited.
  2. Update the missions, goals, and objectives associated with the auditable areas.
  3. Determine the risk related to the potential failure of achieving those stated goals and objectives (including fraud considerations).

These steps are used to establish the auditor’s annual work plan. Table 1 shows the criteria used to weight the risks for prioritization.  The highest weighted risk is financial impact. Other important risks are complexity, human resource and regulatory, technology, mission critical activities and safety. The combined weight prioritizes the risk assessment work plan. Department risk assessments are conducted on 4-6 departments per year. The risk assessment of entire City is completed every four to five years.

 

Risk Assessment Process

Once the audit work plan has been determined, the risk assessment audit uses two approaches to determine the department’s risk level. These are quantitative and qualitative analysis.

Quantitative Analysis

The city has eight steps to its quantitative analysis.  These are:

  1. Identify Risks Criterion
  2. Assigning a weight (in percentage) to each attribute identified, thereby, ranking the significance.
  3. Define the range of assessment value (e.g. 1-5, High, Medium, Low, etc..) for the overall process.
  4. Calculating/Measuring each attribute relative to the auditable entities (areas) identified using data analysis and other relevant and reliable information.
  5. Multiply the raw attributes score for the auditable entity resulting in the Quantitative Component of the auditable area.
  6. Repeat the process for each auditable area.
  7. Aggregate results by Department and Key Business Process.
  8. Repeat the process for each auditable within each department.

Qualitative Analysis

  1. Input from the Audit Department team, directives from the City Council, and concerns expressed by other stakeholders.
  2. Potential impact of significant/notable structural, economic, legislative or environmental changes.

The 2010 risk assessment identified 145 total key business processes, it was discovered that 19 of these were common throughout most departments. Based on the overlaps, the following areas were considered to have high risk:  Compliance, Disaster Recovery, Fleet Maintenance, Grant Management, Project/Contract Management, Public Safety and Security.  In addition, to benefit of identifying the level of risk associated with various activities, the connection of risk to resource allocation has become more completely understood. Moreover, the process has enhanced visibility, transparency and accountability.

Conclusion

The City of Houston is one of a few United States municipalities with an ERM related risk management policy. However, its current risk assessment approach is limited to four or five departments a year.  This makes it different from a full ERM, which covers the whole organization consistently. In this respect U.S. municipalities lag the global contemporaries.

Bio:

James J. Kline is a Senior Member of ASQ, a Six Sigma Green Belt, a Manager of Quality/Organizational Excellence and a Certified Enterprise Risk Manager.  He has over ten year’s supervisory and managerial experience in both the public and private sector.  He has consulted on economic, quality and workforce development issues for state and local governments.  He has authored numerous articles on quality in government and risk analysis. jeffreyk12011@live.com

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Metering & Dosing Pump Operations
Why Do You Need An Asset Management Program? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy