Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by nomtbf Leave a Comment

Different Data Same Decision

Different Data Same Decision

Different Data Same Decision

Let say you have some time to failure data on your equipment. A common action is to calculate the MTBF. All well and good until you expect to make a meaningful decision based on the calculation.

Using just the mean of the data, the MTBF value is likely to provide you with a less than useful bit of information. Thus your decision will be rather random or worthless.

Let’s explore just how this simple calculation of perfectly good data can mislead your decision making.

The Case of Perfect Data

In your factory or within your system you have data on five failures. In this case, the perfect case, all five failures occurred after 1,752 hours of operation. The system was installed and started one year ago, and today at noon, the fifth failure occurred.

What is the MTBF if the equipment has operated for a total 8,760 hours?

Easy right, it is 8,760 / 5 or 1,752 hours MTBF.

This even makes sense since each failure occurs like clockwork at 1,752 hours since start-up or the last repair. The five failures occurred equally spaced over the year.

If the failure is always the same part, we could just replace that part at a convenient time prior to 1,752 hours of operation and avoid the unwanted downtime. This is a ‘perfect’ case and if it occurs with your system, let me know, as I’ve never heard of or seen this type of pattern of failures outside of textbooks or contrived examples.

If you routinely just calculate MTBF who close to this perfect case is your data? Are you assuming this failure pattern when making decisions concerning spares, scheduling, etc?

The Case of  Early Failures

Let’s say another system generates some failure data where four of the failure occurs in the first 100 hours of operation and the last failure occurs at the end of the year. A total of 5 failures again and there has been a total of 8,760 hours of operation.

The MTBF calculation is simple. 8,760 / 5 for 1,752 hour MTBF, right?

Would planning to replace the part as we operate for another 1,752 hours make sense? You could make the same decisions in the  ‘perfect case’ and would likely not see downtime due to the part.

More likely after four failures inside of a week of operation, the team would investigate and solve the issue leading to the ‘early’ failures. Yet, if the end of the year calculation is simply the MTBF value, what have we learned? How could this data distort our understanding of the system’s operation and our best course of action going forward?

The Case of Wear Out Failures

“Bearings and MTBF” is one of my favorite examples. As you know, if a bearing is designed, applied, and installed correctly it will work well. It will function well till it wears out. As the lubrication breaks down it permits metal wear which leads to eventual bearing failure.

In the spirit of the trio of examples, let’s say we have installed five bearings on our system and all five failed after exactly 8,760 hours of use. The MTBF value is once again 8,760 / 5 or 1,762 hours, right?

We know bearing wear out, we know the failure was due to wear, we calculate a value which ignores the wear out time to failure pattern anyway. Why?

If we wanted to design an appropriate maintenance plan for bearings, we would not use MTBF as it would have us replacing them every 1,762 hours (unless those with practical thinking skills and experience intervened).

Making Better Use of Your Data

These three cases are contrived. This serves to illustrate the point that calculating MTBF is rather a waste of time at best. It is going to mislead you and your team by ignoring the time to failure patterns of decreasing or increasing over time. It is likely you will make poor decisions about your system, its reliability, and its maintenance.

Poor decisions cost money.

Treat your data better and make better decisions. Save money.

Instead of calculation MTBF, plot the data using a mean cumulative function. If the data is for a non-repairable element of your system, use the Weibull distortion or appropriate life data distribution to describe the failure pattern over time.

This short article only reveals a small set of a decision making routinely done using MTBF – how have you seen MTBF use lead to poor (and costly) decisions?

Filed Under: Uncategorized

« The Vasa: An Engineering Disaster
Scoring Your RCM Effort »

Comments

  1. David Hartman says

    October 18, 2017 at 9:20 PM

    My boss asked me what the MTBF was for some electro-mechanical aircraft actuators we manufactured. So I got the replacement data from our customer, looked at the return histories, threw out half of the non-verified failures, and came up with a number. He said great we’ll use that for our warranty period. I informed him he’d loose his shirt, the companies too, and be looking for a new job. I showed him a histogram of the failures and explained the left hand half we’d have to pay for. He changed his mind.

    Reply
    • Fred Schenkelberg says

      October 19, 2017 at 10:25 AM

      Great story David – well done! cheers, Fred

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

The Accendo Reliablity logo of a sun face in circuit

Please login to have full access.




Lost Password? Click here to have it emailed to you.

Not already a member? It's free and takes only a moment to create an account with your email only.

Join

Your membership brings you all these free resources:

  • Live, monthly reliability webinars & recordings
  • eBooks: Finding Value and Reliability Maturity
  • How To articles & insights
  • Podcasts & additional information within podcast show notes
  • Podcast suggestion box to send us a question or topic for a future episode
  • Course (some with a fee)
  • Largest reliability events calendar
  • Course on a range of topics - coming soon
  • Master reliability classes - coming soon
  • Basic tutorial articles - coming soon
  • With more in the works just for members
Speaking of Reliability podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Dare to Know podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Accendo Reliability Webinar Series podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy