Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

Effective Concurrent Engineering Reduces Producibility Risk

Effective Concurrent Engineering Reduces Producibility Risk

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Most companies have policies and procedures for concurrent engineering but many are ineffective for various reasons resulting in poor implementation of improved producibilty in their products. I have made this observation based on working for a variety of companies in different industries. Three examples of different approaches I encountered are presented below for your consideration. Two of the examples were used by defense companies, one of which I consider excellent and the other poor. One method was used by a commercial company is one I consider to be very good.

Example 1: Defense Company Poor Approach

A large defense company I worked for had an extensive concurrent engineering program. It worked as follows:

When a contract was awarded, one or two manufacturing engineers (depending on the size and complexity of the project) were assigned to the project to provide producibility support during the design phase. They attended design review meetings typically starting with the PDR (preliminary design review). As a member of the team, they were required to review design documents and make comments. They had no approval authority. There were a few problems with this approach.

First problem: Getting the manufacturing engineers involved at the PDR level was too late because by that time the concept and the basic manufacturing approach had been cast in stone by virtue of the proposed design, concept approach, and the budget and schedule time incurred in developing the preliminary design. As a result, most of the major producibilty suggested changes were rejected by the team leader because “we are too far down the track to make the recommended changes”. The only suggested changes accepted by the team leader were small. For example, increase a tolerance. The manufacturing engineers need to be involved during the early stages of the project starting with the proposal and if not certainly during the concept definition phase.

Second problem: The lack of authority and sign off approval of the concept, PDR, and Critical Design Review (CDR) resulted in giving lip service to the manufacturing engineers recommendations and not serious consideration. The recommendations were taken most of the time as comments and not mandatory changes to the design. Manufacturing sign off authority for the design is essential to establishment of a good effective concurrent engineering program.

Third problem: Assigned manufacturing engineers many times were not qualified or experienced in incorporating producibility changes into a design. The level of qualification and experience is to a large extent is a reflection of the company’s’ commitment to improved producibility.   A top down commitment from management is essential to establish an effective concurrent engineering program.

Example 2-The Defense Company Excellent Approach

This defense company was smaller than the one in Example 1. Their approach corrected all of the problems noted in noted above. We won a large Navy contract for designing, fabricating, testing and delivering hundreds of low cost expendable acoustic training targets. A qualified and experienced manufacturing engineer was assigned to the proposal team which included sign off authority on the proposed design. As part of the proposal team, he created a preliminary assembly flow diagram showing assembly stations, inspection stations and testing points. This was very helpful in generating the proposed cost and price. He was assigned to the project after the contract award providing very important continuity. The manufacturing engineer sat in all of the design review meetings and his comments were taken seriously because the team leader knew he needed his signature approval. Execution of the contract went very well in large part due to the concurrent engineering effort invested into the project starting with the proposal.

Example 3- Commercial Company Very Good Approach

I worked for a large lift truck and material handling company that designed and built inventory based on marketing input. The sales force was responsible to sell the inventory. As a design engineer, I was responsible for generating the design concept, the preliminary top assembly layout, and sizing the components to take the loads. At this point engineering turned the design over to manufacturing who owned it for the remainder of the design development and detail design. In other words, engineering took a back seat to manufacturing. The assigned manufacturing engineer dictated the method of manufacturer for each component including review of each drawing to ensure the tolerancing and design was best one suited for the company’s manufacturing processes. One example of a drawing alteration they may have insisted on was changing a corner radius on a plate to a 45 degree chamfer because it is cheaper to shear the corner than mill a radius. Another example of a change they would ask for was establishment of datum planes from which dimensions were taken to be from a machined surface in lieu of a point in space that would require an expensive fixture to measure. This approach worked very well for this type of commercial product manufacturing company.

SUMMARY 

Three different concurrent engineering approaches are presented above. Each one tailored to the company’s manufacturing process and the industry best practices. As noted above, some are very good and effective while others may leave a lot to be desired. The lessons learned I took away from my experiences are:

  1. Involve manufacturing in the design process starting with the proposal and continuing through concept development, PDR and CDR.
  2. Provide manufacturing sign off authority at all phases of the design to ensure their recommendations are incorporated and not left in the minutes of the design review as just comments.
  3. Assign qualified and experience manufacturing engineer(s) to a project starting at the proposal phase to ensure continuity and meaningful and effective producibilty features are incorporated into the design as opposed to minor comments just to check the box.
  4. Establish a company sponsored concurrent engineering training program to create a team of manufacturing engineer specialists that understand producibilty methods resulting in real product improvement in lieu of just lip service contribution to the team.

Bio:

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has a total of 44 years’ experience, 30 years with DOD Companies. He is a member of PMI (project Management Institute). John has managed numerous firm fixed price and cost plus large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign. John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer.His technical design areas of experience include: radar; mobile tactical communication systems; cryogenics; electronic packaging; material handling; antennas; x-ray technology; underwater vehicles; welding; structural analysis; and thermal analysis. He has experience in the following areas: design; manufacturing; test; integration; selloff; subcontract management; contracts; risk and opportunity management; and quality control. John is a certified six sigma specialist, certified level 2 EVM (earned value management) specialist; certified CAM (cost control manager).

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Bitumen Roadway Repairs
3 Ways to Improve your Reliability Program »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy