Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

Enterprise Risk management is Not a Standalone

Enterprise Risk management is Not a Standalone

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Enterprise Risk management is Not a Standalone

When Enterprise Risk Management (ERM) is advocated, it often seems like it is the end all and be all.  However, this is not true.  It is a methodology which assists management in identifying the risk that can prevent an organization from accomplishing it desired goals.  As such, it should be viewed as another management tool in a range of tools.  Perhaps the best presentation of this idea, for local government, is from the city of Oshawa Canada.  This piece discusses how it has integrated ERM into it continuous improvement process.

City of Oshawa

The City has a population of around 149,000.  It was founded in 1876 by the McLaughlin Carriage Company.  The city is the headquarters of General Motors Canada, and was once called the “Automotive Capital of Canada. It is now seen as an education and health science hub.  In 2016 the city is ranked as the sixth best city for employment in Canada.

In 2013 city staff presented options for the review of city services.  The options were designed to determine how the council wanted to proceed with its continuous improvement process and the level of service review was desired.  Under the continuous improvement process, internal audits are used to focus on specific areas of interest and assist with the overall review. This includes an examination of risk.

Since 2013 the review process has become more integrated and formalized with five key aspects, Core Service Review, Lean Initiatives, Internal Audits, Service Reviews and Risk Management. The last four are considered components of the “Continuous Improvement Framework.”

Core Service Reviews are designed to determine what services the city can provide and at what level. Services are broken down into Mandated/Legislate and Discretionary. Lean processes seek to continually improve customer value and decrease waste. Internal Audits provide assurance that the city’s processes, governance and risk management are consistent with prescribed practice.  Service reviews are less formal than lean initiatives, but have the same objective to increase efficiencies, and reduce costs, while improving customer service. Risk Management provides a planned and consistent approach identifying and reducing the impact of adverse risk events.

Table 1 below shows how the city sees these elements working together and their impact on key criteria.

Conclusion

The City of Oshawa’s integration of ERM with other management practices and activity reviews show how ERM can enhance the city’s ability carry out it functions in an efficient and customer oriented manner.  ERM is also considered to have a High success rate in reducing risk exposure.

Bio:

James Kline is a Senior Member of ASQ, a Six Sigma Green Belt, a Manager of Quality/Organizational Excellence and a Certified Enterprise Risk Manager.  He has over ten year’s supervisory and managerial experience.  He has consulted on economic, quality and workforce development issues.  He has also published numerous articles related to quality in government and risk analysis.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety Tagged With: Enterprise Risk Management, ERM

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« The Definition of Done
Electric Motor Current Protection Saves Your Plant. »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy