Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Kovacevic Leave a Comment

Focus on the Important Issues, Not the Many Issues

Focus on the Important Issues, Not the Many Issues

Utilizing the Pareto Method to Prioritize Improvement Activities

There is limited time, money or resources in every maintenance department.  Sometimes you have 2 of the 3, sometimes just 1.  So how do you prioritize the items or issues that will have the biggest impact on your facility?  There is a simple, yet vital principle that can be used in your facility to determine which issues to focus on.  This principle started in a garden in Italy while studying peas…  This principle which started with an observation of peas can have an important impact on your operation.

What is the Pareto Principle?

This principle is known as the Pareto principle and essentially states that the majority of the issues are caused by a vital few causes.  It is a common rule of thumb in many industries that states 80% of your results come from 20% of your efforts.  The Pareto Chart is one of the 7 Tools of quality which focuses the efforts of any quality improvement on the issues that will yield the greatest return to the organization.

The Pareto Principle uses a chart to visualize the data, showing both bars and a line graph, where individual values are represented in descending order by bars, and the cumulative total is represented by the line.

The left vertical axis is the frequency of occurrence but can be used to represent other factors such as cost.  The right vertical axis is the cumulative percentage of the total number of occurrences or total cost.  The reasons (on the horizontal axis) are arranged with longest bars on the left and the shortest to the right. In this way, the chart visually depicts which situations are more significant and displays a curved line graph.

Using the Pareto Principle

While not exhaustive, the procedure to use a Pareto chart is relatively simple, but let’s first discuss when to use it;

  • When analyzing data regarding the frequency of problems or causes.
  • When there are many problems or causes, and you want to focus on the most significant items.
  • When communicating with others about your data.  The visual nature of the Pareto chart enables others to easily understand the data with little effort.

Now that we know when to use a Pareto chart, let’s look at how to develop one;

  • Decide what measurement is appropriate such as frequency of occurrence, time or cost.
  • Determine what period of time the Pareto chart will cover
  • Collect or assemble the data
  • Subtotal the measurements for each category.
  • Construct and label bars for each category. Place the tallest at the far left, then the next tallest to its right and so on.
  • Calculate the percentage for each category
  • Calculate and draw cumulative sums

Creating a Pareto Chart can easily be done using Microsoft Excel with a bar graph and adding a line graphs as a second data set.  There are many excellent resources on how to do this in Excel, but if you need assistance, please do not hesitate to contact info@eruditio.com.

With the chart complete, the biggest issues can easily be identified and focused on.  However, it is my opinion that at least two Pareto charts be used when focusing on the data.  For example, create one to focus on the frequency of the issues and the other to focus on the time lost due to the issues.   This will help to better understand the data and the true impact on the organization.  By being able to look at the data with multiple lenses, the biggest issue can be identified and focused on.  So what are you waiting for, try the Pareto chart now?

Do you use a Pareto chart in your organization?  If so, what advantages/disadvantages do you find with it?  If not, what is preventing you from using it?  Please comment and discuss your experience with the Pareto chart and principle.

Remember, to find success; you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application
Follow @EruditioLLC

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Enterprise Risk Management, Millennials, and Cyber
At The Intersection Of CMMS And Reliability »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic
High Performance Reliability

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy