Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

When to Incorporate a Risk into the Baseline Schedule or Risk Register

When to Incorporate a Risk into the Baseline Schedule or Risk Register

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Introduction

Risk management involves the identification of risks, prioritization of the risks based on probability of occurrence and impact of occurrence, and mitigation plans to control the risks.  Once identified and prioritized the question then becomes which risks should be incorporated into the schedule and which ones should be included in the risk register?

The general rule of thumb I have used requires risks with a 50% or greater probability of occurrence to be incorporated into the schedule. The other risks are entered into the risk register.

How to Incorporate a Risk into the Baseline Schedule

The first step is to create a Work Package (WP) for the risk which will include a dictionary defining: scope; budget; schedule; input to start task; output to close task and earn value technique.  The activities that are required to be completed to accomplish the task are identified and time phased. These activities constitute the risk mitigation plan.   The WP activities are then added to the baseline schedule and linked to other task activities accordingly. A budget is approved for the WP and allocated to the activities.  As a result of these steps, the risk and mitigation plan is included in the baseline schedule and program budget.

Example of Incorporating a Risk into the Schedule

I was project manager for a foreign military sale (FMS) launcher contract awarded to a Greek subcontractor.  It was a build to print contract which can be very risky depending on the quality and completeness of your Technical Data Package (TDP).  We were not familiar with the TDP provided to use by the government agency.  As a result we identified a risk greater than 50% for the ability of the subcontractor to build the product on time, on schedule and spec compliant.   The mitigation plan for this risk was to provide additional on-site engineering and quality personnel during the upfront manufacturing phase through the first article product to ensure questions and issues that may be raised could be addressed and solved in real time.  A WP was generated with activities, budget was approved, and the task was incorporated into the baseline schedule.  As it turned out, the additional on-site personnel were required and the subcontractor delivered the first article unit on time, within budget and spec compliant.

Summary

If the probability of occurrence of the risk is high (50% or greater), then incorporate the risk mitigation plan into the baseline schedule and budget. As evidence in the example above, if the subject risk was incorporated into the risk register then it would have been too late to provide the extra engineering and quality support required in a timely fashion resulting in a significant impact to the program.

Bio:

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has a total of 44 years’ experience, 30 years with DOD Companies. He is a member of PMI (project Management Institute). John has managed numerous firm fixed price and cost plus large high technical development programs worth in excessive of $100M.  He has extensive subcontract management experience domestically and foreign.  John has held a number of positions over his career including: Director of Programs; Director of Operations;  Program Manager; Project Engineer; Engineering Manager; and Design Engineer. His technical design areas of experience include: radar; mobile tactical communication systems; cryogenics; electronic packaging; material handling; antennas; x-ray technology; underwater vehicles; welding; structural analysis; and thermal analysis.  He has experience in the following areas: design; manufacturing; test; integration; selloff; subcontract management; contracts; risk and opportunity management; and quality control.  John is a certified six sigma specialist, certified level 2 EVM (earned value management) specialist; certified CAM (cost control manager).

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Tracking Large Rotating Equipment
Preventive Maintenance “PM” Programs – Part 1 – The Basics »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy