Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg 2 Comments

Introduction to Control Charts

Introduction to Control Charts

Control charts provide an ongoing statistical test to determine if the recent set of readings represents convincing evidence that a process has changed or not from an established stable average.

The test also checks the sample to sample variation to determine if the variation is within the established stable range. A stable process is predictable and a control chart provides the evidence that a process is stable or not.

Some control charts use a sample of items for each measurement. The sample average values tend to be normally distributed allowing straightforward construction and interpretation of the control charts. The center line of a chart is the process average. The control limits are generally set at plus or minus three standard deviations (of the sample means – commonly called the sampling error of the mean) from the grand average.

When selecting a sub-group size, the intent is to collect samples that are as homogeneous as possible. The intent is to detect shifts between samples as the variation within a sample is relatively small.

One method is to select samples from the process as close together as possible. Another option is to randomly select from across a period of time or batch. The later option may have larger within sample variation, and not as sensitive to shifts in the mean as the first option.

A common sub-group size is 5 items. It is beyond the scope of this note to discuss determining the optimum subgroup size for your particular situation.

Measurements over time

Control charts are measurements over time. Charting the readings in production order or time order allows us to detect drifts readily. A simple control chart is just a chart of the readings over time. By grouping the readings into subgroups, it provides the benefits described above, yet are again plotted in order of production.

If building control charts after receiving the items from a supplier, ask for a means to determine the order of production. A serial number or indexing system may be all that is needed to determine the sequence of production.

X-bar and R control chart

The X-bar and R chart or Shewhart charts are the most common of the many types of control charts. These use a sub-group of items for each sample and plot on two charts the mean of the sample and the range of the sample.

Here is a chart example:


X-bar-example

The plotted points, X-bars, are the average of the sample with n readings,

n is the sub-group size

The center line labeled X-double bar Is the average of the sample averages

UCL and LCL are the upper and lower (respectively) control limits.

The sample readings are taken, averaged and plotted with a dot. The connecting lines are optional and may provide a easier way to interpret the data.

Here is an R chart example:

R-chart-example

R is the range of the sample

The center line, labeled R-bar, ss the average of the sample ranges.

The y-axis should include a span of values suitable to include the or R values and provide a convenient way to plot and read the charts.

These two charts and others like them provide a graphical statistical test for process stability. Used correctly they provide the necessary feedback to allow for process improvement.


Related:

Variables Control Chart Background (article)

Chance of Catching a Shift in a Control Chart (article)

Selecting Control Charts (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistical Process control (SPC) and process capability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Ease and Joy of MTBF Calculations
X-bar and Sigma Charts »

Comments

  1. Randy Clark says

    March 2, 2015 at 9:27 AM

    Nice summary job Fred.

    Best, Randy Clark

    Reply
    • Fred Schenkelberg says

      March 2, 2015 at 10:26 AM

      Thanks Randy, much appreciated. cheers, Fred

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy