Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Sanjeev Saraf Leave a Comment

Is Your Emergency Response Plan Satisfactory?

Is Your Emergency Response Plan Satisfactory?

A chemical facility is mandated to have an emergency response plan by OSHA PSM and EPA RMP. An accident in the plant, a hurricane, and a potential terrorist attack are a few scenarios that mandate emergency response and planning. However, there is a vast difference between having an emergency plan and having a plan that works.

Read the remainder of the article to find out if your facility’s emergency plan is an effective one.

Let us take a hypothetical example of an incident in a chemical plant that results in a release of a toxic cloud which is moving towards the community at 2 m/s. It is evident that your emergency plan should help protect people but is that the only consideration? What all factors should you consider as a part of your emergency plan?

I suggest thinking of an emergency plan implementation in three phases:

  • Acute phase
  • Post-incident phase
  • Business interruption

Let us look at the factors you should consider for each the above phases.

Acute phase

The principal aim of the acute phase is to protect workers and community. But you also need to ask:

  • Should all the workers be evacuated? Is there a recommended evacuation route?
  • Should we initiate a shut-down?
  • What should be the capacity of shelter-in-place?
  • Should the community be evacuated? Can the community evacuate without causing traffic congestion?
  • What should the media be told?
  • Are any measures required for the livestock in the adjoining field?

Post-incident phase

A few considerations you may have to address after the incident:

  • Will the release have a long-term impact on community or property?
  • Are there any symptoms from the release that need to be monitored?
  • Did the release impact community water supply?
  • Is there a remediation technique that needs to be implemented at the community?
  • Under what circumstances should you investigate remediation?
  • What information can be disclosed to media and who has the authority to disclose?

Business interruption

Don’t forget your to take care of your customers.

  • How to recover from the damage to the brand value?
  • Should the manufacturing be stopped and if so, will you lose customers? Are there any backup suppliers?
  • Will your efforts to contain legal exposure harm relations with customers, investors, regulators, and even employees?

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

About Sanjeev Saraf

Reduce risks, Increase Uptime, Reduce costs

I did my first litigation support work in 2000.

Since then I have been obsessed with preventing future failures. Some of these failures can have catastrophic consequences.

Having tried various techniques, learning / unlearning “latest” paradigms, it is clear we have a long way to go!

But instead of thoughtful work, what I mostly see are platitudes and oversimplifications. No keen practical insights!

I want to change that.

« Can you be Proactive in a Reactive Environment?
Are you managing YOUR most valuable asset properly (or at all)? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Photo of Sanjeev SarafArticles by Sanjeev Saraf
in the Operational Risk, Process Safety article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy