Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

Just a Job Syndrome – Risk to Jobs Present

Just a Job Syndrome – Risk to Jobs Present

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

You’ve started a new project; or joined one that’s up and running or it’s nearing closure – and it’s going well.  With no problems to speak of, it’s business as usual; so stick to the plan and it will be all right in the end ‘cos nothing can go wrong.

Or perhaps there are problems; but all projects have problems!  It’s not your problem as the bid team, planning team, or those awkward stakeholders and ever present over demanding clients can be blamed.

The project will eventually get finished if it’s on, or off, the rails.  The project is ‘just a job’ and management just carry on clocking-in and clocking-out regardless of the situation.

The Challenge

The project becomes ‘just a job’ and the management team ‘go with the flow’ rather than looking for risk and challenging the status quo in an effort to resolve issues before they become problems.  An unsolved problem merely means that the project will be extended.  If the project is in a hole it’s easier to keep digging, blindly follow process, keep reporting and be seen to be doing something.

Such satisfactory underperformance does not contribute anything to real progress nor does it add any value.  Progress meetings become rituals where blame is apportioned, countered, and argued.  Problems are “talked about” as we go through the motions of project management without really managing the project and making things happen.

Complacency, routine, and ritual result in a lack of enthusiasm and loss of drive which are recognisable symptoms of ‘just a job’.  The team(s) do not adapt to the dynamics of the project and become passengers who are just along for the ride.

The project becomes ‘business as usual’ – but projects are not business, they make business.  Projects are unique, temporary endeavours within a limited duration that create a product or service.

“Business as usual’ may result in members of the team leaving as they become disillusioned.  Some organisations inevitably find out that their project is failing and, as the scapegoats are targeted, and teams are eventually reorganised, the good people who have not already left, leave.

The Riposte

So how can we avoid such complacency on a project? It’s ABC – Attitude, Behaviour and Consequences.

A positive attitude towards time and focussing on the job in hand is essential.  Cultivating a culture that believes fixing today’s problem tomorrow is too late; yesterday is over; tomorrow never comes; and the right time to do it is NOW! are essential.  “Better late than never” never delivered anything on time.

You need a similar attitude towards risk management.  Zero tolerance towards procrastination and avoiding analysis-paralysis while promoting initiative is also essential.  This requires moral fortitude and “asking for forgiveness’ is the order of the day rather than a genuflecting “request for permission”.  This promotes a culture of ‘can do’ rather than ‘may be’ and those people who ‘forgive’ instil that culture.

“The more I practice…the luckier I seem to get” is well known in golfing circles but the same is also true in Project Management.  The more a PM reviews the project the more is known about the project.  Such behaviour results in keeping one’s finger on the pulse, regularly assessing the situation, and seeing ‘anomalies’ and emerging issues.

PMs who apply their own experience (and that of others), and make timely and (hopefully) good decisions will have positive consequences on the project as well as the project team.  And if the project is in a hole, the PM must have the guts to order “stop digging”; then take a geographic approach to map a route out of the hole rather than arguing the difficulty and researching a history to the problem.

Conclusion

Projects that become business as usual are breeding grounds for complacency and there is a real risk that the project could be well off the rails and in a deep hole before anybody realises it.

Blindly following processes and procedures, reflecting on the past and not keeping your finger on the pulse will not allow project risks to be recognised.  Issues will not be identified, and the positive action required to solve problems in a timely manner will be late.

If the project has become ‘just a job’…then it’s not really a project anymore.

Bio:

MBA, MSc DIC, BSc; Chartered Engineer, Chartered Geologist, PMP

Over thirty years’ experience on large multidisciplinary infrastructure projects including rail, metro systems, airports, roads, marine works and reclamation, hydropower, tunnels and underground excavations.

Project management; design & construction management; and contract administrative in all project phases from feasibility, planning & design, procurement, implementation, execution and completion on Engineer’s Design and Design & Build schemes.

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Is Your Wet Scrubbing Tower Working?
What is Asset Management? »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy