Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Kovacevic Leave a Comment

109 – Top 10 Machinery Installation Issues with John Lambert

109 – Top 10 Machinery Installation Issues with John Lambert

Top 10 Machinery Installation Issues with John Lambert

When you are installing a new machinery in a facility of the organization, there are certain issues. These issues are listed from top to the bottom categorized on the basis of seriousness. The top of the list is shaft alignment. It is the most common issue while installing the machinery. It occurs due to lack training or of precision instruments, as well as measurement misconceptions. Most organizations think they have achieved alignment just because an instrument showed so. They don’t take the stress and heating mechanisms into account which causes misalignment between the collinear wings of the shaft.
ᐅ Play Episode

Filed Under: Rooted in Reliability: The Plant Performance Podcast, The Reliability FM network Tagged with: coupling run-out, John Lambert, machine looseness, machinery installation issues, offline to running, pipe strain, shaft misalignment, soft-foot

by James Kovacevic Leave a Comment

68 – Condition Monitoring with John Lambert

68 – Condition Monitoring with John Lambert

Condition Monitoring with John Lambert

Ever wonder why your assets aren’t producing the value they are supposed to even if you have trained staff and big budgets? Are you a fan of Predictive maintenance improvement of your organizational processes? Then, condition monitoring is where you should start. The meaning of this word is as simple as the word itself. You just need to check the state of your asset on a regular basis and as the state of your asset change, you would know what possible failures that change can lead to and then you can try predictive maintenance strategies to stop that failure from occurring in the first place.
ᐅ Play Episode

Filed Under: Rooted in Reliability: The Plant Performance Podcast, The Reliability FM network Tagged with: Condition Based Maintenance, John Lambert, RCM, Reliability Centered Maintenance

by James Kovacevic Leave a Comment

58 – Understanding Thermal Growth with John Lambert

58 – Understanding Thermal Growth with John Lambert

Understanding Thermal Growth with John Lambert

In this episode, the thermal growth and the understanding of the phenomenon—how it occurs and how to prevent and calculate it—is being discussed by John Lambert. So, first of all, we have to know what actually the thermal growth is. The answer is simple. This phenomenon occurs when the rotating machines get hot due to the difference in temperature and they start to expand in every direction. As these machines are mostly metal so their thermal growth is explained by the coefficient of linear thermal expansion that is already known for many different materials.
ᐅ Play Episode

Filed Under: Rooted in Reliability: The Plant Performance Podcast, The Reliability FM network Tagged with: John Lambert, precision maintenance, shaft alignment, Thermal Growth

by James Kovacevic Leave a Comment

30 – The Importance of Proper Installation: Starting with Pulley & Sprocket Alignment with John Lambert

30 – The Importance of Proper Installation: Starting with Pulley & Sprocket Alignment with John Lambert

The Importance of Proper Installation: Starting with Pulley & Sprocket Alignment with John Lambert

In this episode of the weekly podcast, the guest John lambert is talking about the condition based maintenance which means that you can take maintenance measures based upon the condition of your equipment. In simple words, you can maintain your equipment by analyzing the installation process, alignment of the equipment, and that sort of factors.
ᐅ Play Episode

Filed Under: Rooted in Reliability: The Plant Performance Podcast, The Reliability FM network Tagged with: Alignment, Installation, John Lambert, PdM, Pulley, Sprocket

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

The Accendo Reliablity logo of a sun face in circuit

Please login to have full access.




Lost Password? Click here to have it emailed to you.

Not already a member? It's free and takes only a moment to create an account with your email only.

Join

Your membership brings you all these free resources:

  • Live, monthly reliability webinars & recordings
  • eBooks: Finding Value and Reliability Maturity
  • How To articles & insights
  • Podcasts & additional information within podcast show notes
  • Podcast suggestion box to send us a question or topic for a future episode
  • Course (some with a fee)
  • Largest reliability events calendar
  • Course on a range of topics - coming soon
  • Master reliability classes - coming soon
  • Basic tutorial articles - coming soon
  • With more in the works just for members
Speaking of Reliability podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Dare to Know podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Accendo Reliability Webinar Series podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy