Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Mike Sondalini Leave a Comment

Lean Improvement Success at a Concrete Reinforcing Bar Manufacturer

Lean Improvement Success at a Concrete Reinforcing Bar Manufacturer

Reinforcing bar is forged steel used in concrete to give the otherwise weak concrete structural tension strength. Reinforcing bar manufacturing is done in a factory using computerised machines to straighten, cut and bend the steel. It is a highly automated process once the bar is loaded onto the manufacturing machinery. These machines are computer controlled and form the bar to the shape and dimensions instructed. The bar specification and dimensions are identified from the engineering drawings by the Scheduler who enters the details into a scheduling software program. The program converts the reo-bar size requirements into computer controlled manufacturing instructions for the machines and a delivery schedule for the production shop.

Our assignment was to identify opportunities to improve the business and streamline the operation from production through to delivery.

A Lean improvement investigation of this nature starts by drawing the process maps for each stage of the operation. Beginning with the acceptance of an order through to its delivery at the construction site, the entire business was process mapped one phase at a time—order acceptance, quantities take-off, scheduling, raw materials supply, manufacture, despatch, and delivery.

In order to draw the process maps correctly and reflect current state practices our Lean Consultant interviewed Supervisors from each department in the operation. The Supervisors explained in detail the activities and tasks done in each process phase as an order progressed through the business. From their detailed descriptions the process maps for each department were developed. Each task was given an individual name and a short description of the activity performed was written in or under the box for that task. The process map was reviewed by the Supervisor to confirm its accuracy and make any necessary changes to reflect the real current state map of the operation.

With the businesses processes well documented and flow charted our Lean Consultant began analysing each phase of the business by collecting data on the variations in performance of a process. Every business process has a natural distribution of performance outcomes. We wanted to view that performance distribution and needed factual data from running the process over a sufficiently long time. Some data could be collected off historical records. Some data was collected by observing and recording the activities as they were done.

We were interested in the ends of the distributions—below average performance and above average performance. We wanted to know why the same process could produce such a wide range of results. What were the costs and losses of poor performance when compared to the average performance? What were the time and waste savings from better than average performance? If we could understand what caused the good results we could then mimic those requirements by changing the process to make those great outcomes became business-as-usual practice.

This is how you improve a business process without spending additional capital. The business could have brought new, faster machines. It could have brought new scheduling software and software that better integrated information flow throughout the business. But that would not improve the business process performance. A few steps in the process might be done quicker but the variation would still exist, and probably become even worse.

Now that we understood the process variations and their causes we could draw the future state maps with confidence that truly profitable Lean process improvements could be simply and quickly made in the operation. Had we suggested a future state map too early, for example after drawing the current state maps, it would have been guess work because there would have been no real evidence to support those recommendations. But by collecting and analysing the true process performances we had hard facts and clear financial justification for every one of our recommendations.

We recommended that scheduling be changed from push production to pull production where Despatch set the production schedule and trucks could be fully loaded. We recommended that finished bars not be stored in intermediate storage racks awaiting delivery to again be lifted a second or third time, but instead transportable racks that stacked the orders be made which fitted safely on truck trays. Each stacking rack would start on the shop floor and be loaded directly from the last manufacturing step and be filled with all the loads for a delivery. Once full the entire rack would be lifted onto the truck at once. A low cost handling improvement that saved hours in loading each truck one delivery at a time.

This is our speciality—making Lean work in your company by recovering the hidden-factory you have, and turning what was waste into new, handsome profits for your business. Contact Us now and start working on your great and successful Lean future today.

My best regards to you,
Mike Sondalini
Managing Director
Lifetime Reliability Solutions HQ

Filed Under: Articles, Maintenance Management, on Maintenance Reliability

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« What is Preventive Maintenance and How are Task Intervals Assigned?
Being Setup for Failure »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Headshot of Mike SondaliniArticles by Mike Sondalini
in the Maintenance Management article series
articles provided with permission of Lifetime Reliability Solutions

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy