Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Reyes-Picknell Leave a Comment

Lean or Industrial Anorexia

Lean or Industrial Anorexia

In 2014, at an IMEC conference organized by the University of Toronto, Art Rice of Maintenance Technology Magazine said that in many cases “Lean is a form of Anorexia”. He was right then, and he is still right today.

When I heard him, I realized that in many cases where I’ve seen attempts at “lean manufacturing” the lean really means “understaffed”. In those cases some of the lean manufacturing tools have been implemented, often with the help of outside expert help but lean results haven’t occurred. The introduction of “lean” in those companies was yet another attempt to cut costs without any deep thought as to what caused the high costs before introducing “lean”.

The diagram above shows the types of waste (Muda) that lean tackles. People are not on the list! Yes, lean can save on costs, but cost cutting without addressing the underlying causes of waste won’t work. Cost cutting does not change the way that things are done and on its own it cannot be successful. If cost cutting has targeted staff reductions, then remaining staff will attempt to make up for their lost colleagues work, only to find themselves overloaded. After all, nothing was done to change how they work. That feeling of being overloaded comes atop the fear that “I might be next”. Eventually, laid off staff are replaced with more expensive overtime or contractors. The real causes of unacceptably high costs are seldom dealt with.

The “Achilles heal” of lean manufacturing is usually unreliable operation of the plant and equipment. Without high reliability from the assets themselves the objectives of lean – removal of waste, cannot be achieved. If equipment is unreliable, inventories of work-in-process and / or finished goods must be maintained to accommodate the frequent and sometimes lengthy downtime incidents. Optimizing your maintenance department to “fight fires” faster might reduce repair times, but it isn’t cost effective. However, without any attempt to work smarter, it becomes the default approach that companies often make.

Rather than get to the root of the reliability problems, deal with them proactively and improve plant performance, organizations often choose (through inaction and sub-consciously) to deal with them reactively. When failures happen they get fixed. The machine has dictated the timing and the work scope needed. Maintainers run from breakdown to breakdown, often without even having time to perform Root Cause Failure Analysis to eliminate the problem in future. You never quite catch up with all the failures and never quite move to a steady state smooth operation. In fact, when in breakdown mode, time is rarely made available to do proactive maintenance.

Even if your organization does RCFA, it’s not enough. Ask yourself this question: “would you fly in a newly designed aircraft if you knew its maintenance program was being designed using RCFA?” I think I know your answer.

Most of us fly at some time, and we do it safely. Airlines use proactive approaches to managing failures so that safety and performance are enhanced. They rarely wait until something goes wrong and then respond. They have forecast what could go wrong, before it does, and take steps to manage the failure itself, or if that’s not possible, to minimize the consequences of it when it does happen.

Reliability and reliable performance is achievable. High levels of availability result from high reliability, but more importantly, sustainable long and incident free operations depend on it. Lean operations must be reliable operations or they will not remain lean. Reliability also leads to improved performance in the areas of safety and environmental compliance. Finally, something your finance people will love to hear – it’s actually less expensive to run reliably than it is to run a reactive approach.

Ask us how you can get there.

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« The New Normal: What Was the Old One?
Understanding ISO 14224: You Guide to Sustainable Defect Elimination »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy