Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Kovacevic Leave a Comment

Living With The 6 Failure Patterns

How To Manage Each Failure Pattern With An Effective Maintenance Strategy

Most maintenance and reliability professionals have seen the six failure patterns (or failure hazard plots), described by Nowlan and Heap.  In case you are unfamiliar with them, you can learn more about them in a previous article on them.   Here is a quick summary to jog the memory, just in case.

  • A. Bathtub Curve – accounts for approximately 4% of failures
  • B. Wear Out – accounts for approximately 2% of failures
  • C. Fatigue – accounts for approximately 5% of failures
  • D. Initial Break-In – accounts for approximately 7% of failures
  • E. Random – accounts for appoximately 14% of failures
  • F. Infant Mortality – accounts for approximately 68% of failures

From the above, you can see that the majority of failures experenced are not directly related to age, but are the result of random or induced failures.   So how does this help when establishing a maintenance program?   First, we must understand what the patterns tell us.

What Types of Failure Modes Do The Failure Patterns Relate to?

Looking at the different failure patterns, we can group the types of failures into three unique groups;

  • Age-Related failures – The term “life” is used to describe the point at which there is a rapid increase in the likelihood of failure.     This is the point on the failure pattern before it curves up.  Typically these types of failures can be contributed to wear, erosion, or corrosion and involve simple components that are in contact with the product.
  • Random failures  – The term “life” cannot be used to describe the point of rapid increase in the likelihood of failure, as there is no specific point.  These are the flat parts of the failure curve.  These types of failures occur due to some introduced defect
  • Infant Mortality – The term “life” cannot be used here either.  Instead, there is a distinct point at which the likelihood of failure drops dramatically and transitions to a random level.

Understanding these unique differences, an effective maintenance strategy can be developed.

What Maintenance Needs to Be Done for Each Failure Pattern?

The maintenance activity selected has to be right for the specific failure pattern.   When looking at the failure patterns, there are three unique types of activities that can be put in place to address all points in the failure curve.

  • Age-Related – These types of failures can be addressed through fixed time maintenance.  Fixed time maintenance includes replacements, overhauls, and basic cleaning and lubrication.  While cleaning and lubrication will not prevent the wear out or corrosion, it can extend the “life” of the equipment.
  • Random – These types of failures need to be detected, as they are not predictable, or based on a defined “life.”   The equipment must be monitored for specific indicators.  These indicators may be changes in vibration, temperature, flow rates, etc.   These types of failures must be monitored using Predictive or Condition monitoring equipment.    Cleaning and basic lubrication can prevent the defects from occurring in the first place if done properly.
  • Infant Mortality – These types of failures cannot necessarily be addressed through fixed time, predictive or condition-based maintenance programs.  Instead, the failures must be prevented through proper design & installation, repeatable work procedures, proper specifications and quality assurance of parts.

Only when a maintenance program encompasses all of the above activities, can plant performance improve.

Determining the Right Frequency of Maintenance Activities for Each Failure Pattern

So with all of the activities taking place, how is it possible to know when each fixed time activity or condition monitoring inspection take place?   The approach to determining the frequency of activities for fixed time and condition monitoring inspections are different.  However, before the approaches are discussed, it should be noted that MTBF should NOT be used to determine the approach… EVER (sorry, the rant is over).

  • Fixed Time Maintenance – The frequency for fixed time maintenance activities should be determined using a Weibull analysis.   Also, there may be regulatory requirements which specify the frequency of these activities. This will provide an ideal frequency to perform these types of activities
  • Condition Monitoring – The frequency for condition monitoring activities should be determined by using the P-F Curve and P-F Interval.   This approach requires an understanding of the ability of monitoring technology, the defect being monitored, degradation rates, and the ability of the organization to react to the information gathered during the monitoring program.   This will be furthered discussed in next weeks post.

I hope this has provided some clarity around how you should be using the six failure patterns in your maintenance strategy.   Do you have specific activities in your program to address age-related, random and infant mortality failures?  If you only have fixed time maintenance activities in your program, what are leaving on the table?

Remember, to find success; you must first solve the problem, then achieve the implementation of the solution, and finally sustain winning results.

I’m James Kovacevic
Eruditio, LLC
Where Education Meets Application
Follow @EruditioLLC

References;

  • RCM2
  • Understanding the 6 Failure Patterns
  • Weibull Analysis
  • www.NoMTBF.com

 

Filed Under: Articles, Maintenance and Reliability, on Maintenance Reliability

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

« Guide to Maintenance Planning and Scheduling
Maximizing Oilfield Equipment Reliability »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Maintenance & Reliability series


by James Kovacevic
High Performance Reliability

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy