Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by nomtbf Leave a Comment

Maintenance and MTBF

Maintenance and MTBF

Does MTBF have any role in Maintenance?

Reliable, ADM in afternoon light by Seth Anderson
Reliable, ADM in afternoon light by Seth Anderson

No. You should not use MTBF when designing or scheduling maintenance programs or tasks. Furthermore, it is a very poor metric to monitor equipment performance.

The basic calculation of MTBF (or MTTF) and assuming the equipment time-to-failure distribution is the exponential distribution implies the equipment downing event occurs randomly. In other word the equipment doesn’t break in and actually lower it’s chance for failure over time, nor exhibit wear out or the increase of failure rates over time.

The chance of failure is constant over time and does not change given the time the system or component has been in service.

MTBF dose provide the average time between failures and does not provide any information about when the failures may occur if the actually failure do not occur randomly. Furthermore the exponential distribution has a memoryless feature, meaning a motor that is brand new and a similar motor with1,000,000 hours of service each have the same chance to fail in the next hour.

The MTBF calculation or vendor supplied value does not include information about how the failure rate may change over time.

Wear Out and Maintenance Planning

Let’s use a motor as an example for a simple maintenance planning exercise. Let’s say the motor has an MTBF of 100,000 hours provided by the vendor. There isn’t any maintenance on the motor, such as lubrication or alignment checks, yet we are planning to use 100 motors in the plant and need to plan for spares.

How many spares will we need over the next year to replace faulty motors.

Using just MTBF, we can use the probability of successful operation over the year, 8760 hours, and quickly estimate how many of the 100 motors will require replacement.

$latex \displaystyle&s=3 R(t)={{e}^{{-t}/{\theta }\;}}$

t is 8760 hours

θ is the MTBF or 100,000 hours

Thus, we find 91.6% of units should survive one year of operation. That means out of 100 installed motors, we expect about 8.4% to fail, or 8 or 9 units. Of course we could add a confidence bound to this calculation plus include the time the replacement unit operate for a bit more accuracy. For this example we’ll keep it simple.

Yet, we know based on experience with other similar motors that they rarely fail during the first year. With a little work we find the motors do actually wear out primarily due to bearing wear. And another call to the vendor we find they recommend using the Weibull distribution with β of 2 and η of 90,000 hours.

The reliability function for the Weibull distribution is

$latex \displaystyle&s=3 R\left( t \right)={{e}^{-{{\left( {}^{t}\!\!\diagup\!\!{}_{\eta }\; \right)}^{\beta }}}}$

Where η is the characteristic life, in this case 90,000 hours

And, β is 2.

Thus over one year we would expect 99% of the motors to survive, meaning only 1 is expected to fail.

Using MTBF would have us buy 7 or 8 extra spares unnecessarily.

Maintenance Scheduling

We know that motors wear out. Given only MTBF and the exponential distribution assumption we do not have sufficient information to schedule motor replacements.

If the motors actually failed randomly, as assumed, then our only strategy is to replace motors as they fail. Since the chance to fail each hour remains constant arbitrarily replacing motors at a any point in time will not avert or change the chance of failure the next hour.

When we model the wear out behavior, I.e. Weibull distribution with β of 2, then we can calculate the time at which the chance of failure is economically unacceptable. For example, if we typically operation in 1 week shifts of 168 hours then have time for maintenance tasks, we can calculate the chance of failure over a week period after one year, two years, etc. And determine when the chance of failure becomes unacceptable.

Knowing how the failure rate changes over time we can schedule replacements and maintain a relatively lower overall failure rate.

Summary

Find or estimate the information concerning the changing rate of failure over time. Ignoring wear out or early failures by using MTBF only will cost you and your plant money.

Understanding and modeling the wear out patterns allows you to secure spares as needed. You can avoid costly downtime by doing replacements before the chance of failure is too high.

PS: I’m working on examples and update to the draft book on MTBF to include more maintenance reliability specifics.

Filed Under: Uncategorized

« Worst Case Tolerance Analysis
Why do Tolerance Analysis »

Comments

  1. per bisgaard says

    December 18, 2014 at 12:29 AM

    Hi Fred
    A very good article—more or less i agree.
    One question, in the article you have examined reliability data from the motor vendor
    Weibull distribution with β of 2 and η of 90,000 hours.
    If we do not want to use only MTBF/ MTTF values. Do you have experience in other “Weibull distribution “, not only on motors but also on contactors, relays etc. What about a powersupply with capacitors, they are also exposed to “wearout”
    What would be “the best guess”
    Per

    Reply
    • Fred Schenkelberg says

      December 18, 2014 at 1:07 PM

      Hi Per,

      Thanks for the note. The Weibull distribution for the motors in the articles is just an example. Not real data. For any component if you have time to failure information fit the data to a Weibull and find your parameters.

      http://www.barringer1.com has a listing of beta and eta ranges for many different types of parts. Some have very large ranges, like motors, due to the many types of motors and use conditions.

      I typically fit data to a Weibull distribution as it is so versatile. Lot’s of experience with Weibull and with many parts and systems.

      Cheers,

      Fred

      Reply
  2. Shitiz Sud says

    December 31, 2014 at 9:30 PM

    Hi Fred,
    Just to avoid the confusion, you may like to change in your article “The reliability function for the Weibull distribution” as

    \displaystyle R(t)={{e}^{-{{\left( {t}/{\eta }\; \right)}^{beta}}}}

    Reply
    • Fred Schenkelberg says

      December 31, 2014 at 11:27 PM

      thanks, you’re right, really should include the function.

      Cheers,

      Fred

      Reply
  3. Tim says

    January 7, 2015 at 2:40 PM

    Hi Fred,

    Again the assumptions on Beta and Eta.

    “I typically fit data to a Weibull distribution as it is so versatile. Lot’s of experience with Weibull and with many parts and systems.”

    You do need failures (and a good analyse of them) to get a Weibull distribution, even more, you need failures with the same root cause.
    If you have different root causes you have different Weibull distributions.

    For a maintenance phase you probably would expect the Beta and Eta values from the development tests (if they have record of that).

    Reply
    • Fred Schenkelberg says

      January 7, 2015 at 9:50 PM

      Hi Tim,

      I learned that the first step when confronted with a stack of data is to plot it. A histogram, a probability plot, stem-and-leaf, what ever kind of plot and often do many plots. What I have found with time to failure data, of any form or structure or source, just plotting it helps you form good questions that lead you to a proper analysis.

      I highly recommend plotting the data – Weibull is informative as a starting point, which is why I recommend it.

      Sure, life is great if all the failures are due to one failure mechanism, sure there are still plenty of assumptions and issues. Yet, we do need to move forward with an analysis and I’ve found asking insightful questions about the data is a great start.

      Might have to do a blog post on using Weibull for different types of analysis, or case studies, etc. Want to join me and provide some examples of how you analyze field data?

      Cheers,

      Fred

      Reply
  4. Shitiz says

    January 7, 2015 at 10:18 PM

    Hi Fred
    This question still haunts me.
    Why Weibull is applicable for only one failure mode. Is it an assumption of carrying out this analysis?
    What would happen to Weibull distribution if we consider different failure modes altogether.
    For example: If we plot Weibull distribution for a pump having seal failure, bearing failure, coupling failure etc.

    Reply
    • Fred Schenkelberg says

      January 7, 2015 at 10:42 PM

      Hi Shitiz,

      I do this regularly. For a product like the pump and various elements that fail – plotting the pump time to failure, and each failure mechanisms provides a nice chart showing the different individual failure plus the system failure. I’m assuming any failure causes the system to fail and after the repair the system is as good as new.

      For repairable systems it is also informative to use the mean cumulative function plot. See http://nomtbf.com/2012/02/graphical-analysis-of-repair-data/ for details. It is a non parametric plot that provide useful insights for repairable systems.

      Try a few different plots and take a look, ask good questions and improve the product, system or process – that’s the goal, not perfect analysis.

      Cheers,

      Fred

      Reply
  5. Shitiz says

    January 7, 2015 at 11:02 PM

    Thanks Fred.
    I like your last statement. It really makes sense.

    Reply
  6. Tim says

    January 8, 2015 at 4:32 PM

    Hi Fred,

    Would love to see more posts on the Weibull analyses.
    We should get it as widely spread as possible I think.
    I is just that I see Weibull distributions used to calculate reliability without any clue why the Beta and Eta used is chosen.

    You actually cannot assume a Beta and Eta without prior knowledge of a similar product or failure type.

    Kind Regards,

    Tim

    Reply
    • Fred Schenkelberg says

      January 8, 2015 at 5:53 PM

      Hi Tim,

      I’ll work on it – always looking for topics that have some interest 😉

      And, if you’d like to write up a few articles that would be wonderful. I know you know this stuff.

      Cheers,

      Fred

      Reply
  7. Thiago says

    August 7, 2016 at 1:27 PM

    Hello Fred,

    Nice article.
    I´m trying to do such calculation for a product, which had its MTBF and Failure Rate calculated based on the electronic components on the board.
    It has 10 years warranty, but I can´t say the characteristic life.. How can I use the Weibull distribution with these data to predict the amount of spare parts?

    Reply
    • Fred Schenkelberg says

      August 31, 2016 at 10:46 AM

      Thanks Thiago for the kind words. If all you have is MTBF and Failure Rate, likely from a parts count prediction, you really do not sufficient information to estimate spares. You essentially have a fictional number that does not relate to actual field reliability performance.

      Even is the estimated MTBF is accurate, it suggests that the only appropriate maintenance strategy is to replace upon failure. So, if I were you, I’d get a few spares and track actual data until you can properly determine the appropriate spare stocking level.

      Cheers,

      Fred

      Reply
  8. Tim Newman says

    March 26, 2018 at 6:23 PM

    Hi Fred- this is an item that I am currently speaking with the developers of OPUS 10 about. They have responded to my query by stating that it doesn’t matter what distribution is used, their tool’s results don’t differ much- for systems in steady state.
    The critical part of their response is the mention of steady state. Most systems I deal with never get to steady state, and inj my industry, the use of OPUS 10 is mandated in many projects. I’ve seen the results first hand, by being in touch with projects over long time frames. As an example, circuit breakers. The OEMs often cite ridiculous MTBFs, but given a “reasonable MTBF of , say, 180k hours, versus a Weibull char life of 160k hours and beta of 2, a 10 year sparing shows a demand of 3 for the exponential, and 1 for the Weibull. For time frames beyond 20 years, the average demand is similar, but for periods less than the true mtbf, the results are terrible. Whilst I think MTBF is bad in many ways, I don’t subscribe to “noMTBF” as you do. Actually knowing what MTBF is part of providing that expertise as a RE.

    Reply
    • Fred says

      March 27, 2018 at 2:54 PM

      Hi Tim,

      Good luck with the software folks – as you mention the evidence that we don’t achieve steady state alters the results.

      I agree REs need to understand MTBF and educate others that MTBF is not Reliability and often not useful for making any type of decision. Then provide alternatives that are useful.

      Cheers,

      Fred

      PS: thanks for reading the articles and commenting, much appreciated

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

The Accendo Reliablity logo of a sun face in circuit

Please login to have full access.




Lost Password? Click here to have it emailed to you.

Not already a member? It's free and takes only a moment to create an account with your email only.

Join

Your membership brings you all these free resources:

  • Live, monthly reliability webinars & recordings
  • eBooks: Finding Value and Reliability Maturity
  • How To articles & insights
  • Podcasts & additional information within podcast show notes
  • Podcast suggestion box to send us a question or topic for a future episode
  • Course (some with a fee)
  • Largest reliability events calendar
  • Course on a range of topics - coming soon
  • Master reliability classes - coming soon
  • Basic tutorial articles - coming soon
  • With more in the works just for members
Speaking of Reliability podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Dare to Know podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Accendo Reliability Webinar Series podcast logo

Subscribe and enjoy every episode

RSS
iTunes
Stitcher

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy