Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

Managing Risk is Critical to Project Success

Managing Risk is Critical to Project Success

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

A project with a poor risk management foundation is like a house with a fragile foundation. Eventually it will fail.

Why Should It Matter to You?

Knowledge and skills with the four cornerstones of risk management, dramatically increase the probability of you realizing project manager success. Conversely, a lack of knowledge will likely lead to poor project manager performance.

What are the Four Cornerstones of Project Risk Management?

The cornerstones for effective project risk management are:

-Program Management
-Risk Management
-Earned Value Management
-Subcontract Management

Project Management

The majority of projects fail due to known risks. The known risks are:

-Scope (poorly written and understood scope)
-Schedule (unrealistic schedule where the assigned staff is not aligned with it
-Cost (understated or unrealistic budget)
-Quality (comprised quality to compensate for poor schedule and cost)

It is essential you become proficient with program management. This means understanding the common components of projects, the project management process, and the project management elements. If you succeed, you will have the knowledge and tools to manage known risks on your project. Absolutely necessary cornerstone to managing the known risks on a project.

Risk Management

All projects are subjected to unknown risks. These are uncertainties and variations that surround each project.

The risk process for a project entails: identification; analysis; handling (risk response) and monitor/control. To be successful as a project manager, it is essential you learn this process. Vital cornerstone to identify, assess, handle, and monitor/control risks. In other words, to manage unknown project risks.

Earned value Management (EVM)

EVM is a project management tool for measuring progress against the project plan. A benefit of EVM is that it identifies cost and schedule issues early in the project to provide maximum time to recover or mitigate problem. It is one of the most effective (if not the best one) tool for tracking and monitoring progress on a project.

The more variance and uncertainty to a project, the more risk to a project. EVM is an effective tool to reduce and control these constraints. Hence, less variance and uncertainty and less risk. Effective cornerstone for tracking and monitoring risks.

Subcontract Management

Many companies outsource work to subcontractors. Some companies outsource 60-70 %of the work.  Subcontractors can be a major risk source to a project due to schedule delays, budget overruns, and technical issues. It is essential for project success to select subcontractors carefully and manage them well. Otherwise, they can create serious chaos on your project that will be difficult to recover from. Essential cornerstone for managing subcontract risks.

Four Cornerstones

Each cornerstone within its own rights is a powerful process. Integrate them together and you have a synergy of process power to effectively manage risk on your project.

Call to Action

If you want to be a successful project risk manager, then buy my book. It is entitled ‘Project Risk Management’ and is on sale at Amazon and Kindle. The book is innovative and includes unique knowledge, explanations and examples of the four cornerstones of project risk management. It explains how the four cornerstones are integrated together to effectively manage the known and unknown risks on your project.

Bio:

John earned a BS in Mechanical Engineering and MS in Engineering Management from Northeastern University. He has a total of 44 years’ experience, 30 years with DOD Companies. He is a member of PMI (project Management Institute). John has managed numerous firm fixed price and cost plus large high technical development programs worth in excessive of $100M. He has extensive subcontract management experience domestically and foreign.  John has held a number of positions over his career including: Director of Programs; Director of Operations; Program Manager; Project Engineer; Engineering Manager; and Design Engineer. His technical design areas of experience include: radar; mobile tactical communication systems; cryogenics; electronic packaging; material handling; antennas; x-ray technology; underwater vehicles; welding; structural analysis; and thermal analysis.  He has experience in the following areas: design; manufacturing; test; integration; selloff; subcontract management; contracts; risk and opportunity management; and quality control.  John is a certified six sigma specialist, certified level 2 EVM (earned value management) specialist; certified CAM (cost control manager).

 

<hr />
<div class=”disclaimer”>*Accendo Reliability participates in the Amazon Services LLC Associates Program. This affiliate advertising program provides a way for sites to earn a commission on links to Amazon. As an Amazon Associate, I earn from qualifying purchases. In short, this means when you buy something on Amazon after following a link from this site, we get a small percentage of its price. This helps support Accendo Reliability by offsetting a portion of the cost to maintain the site. And, your support is much appreciated.</div>
<hr />

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« 3 Considerations on Data
There Might be 50 Reasons to Use a Histogram (or Bar Chart) »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy