Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by James Reyes-Picknell Leave a Comment

Myth Busting 11: Leave Room for Surprises

Myth Busting 11: Leave Room for Surprises

Surprises happen anywhere and to anyone. In your operation, you can expect that regardless of your best efforts, some work will arise that must be done right away. Most would call these emergencies.

To me, an emergency is something that is or is about to have a MAJOR impact on: Safety (i.e.: injury or death), Environment (i.e.: a major incident that is likely to get you fined or shut down), or Production/service delivery (i.e.: irreparable impact on the bottom line in the financial reporting period).

Anything less than those could be urgent (i.e.: we need to get on it before the next scheduling cycle or it could escalate into one of the above), or routine (i.e.: it can wait for the next one or two scheduling cycles). Note that a scheduling cycle is normally weekly.

Note that the impacts above are all on the organization, not on any individual. Anything that is upsetting a shift or daily quota, that might look bad for a supervisor, or another boss, is not an emergency nor urgent. Should we allow room in our schedule for these?

Many planners and supervisors, particularly from operations, believe we should. They believe we should make allowance to cover any eventuality. The result of that is usually that too much unscheduled time is left “slack” in the schedule. Of course, that doesn’t mean your work crews will be hanging around doing nothing. Quite the contrary. They will always look very busy. Parkinson’s Law states that work will always expand to fill the time available for it to be done. That’s inefficient.

In a well-run organization with a high percentage of planned work, good scheduling, and good schedule compliance, there shouldn’t be any “emergencies” of the types described above. To achieve those levels of planning, scheduling and compliance require that you have an effective proactive maintenance program. If you have that, then you’ve thought of the sorts of failure modes that could occur and already defined what to do about them – mostly proactive, and that is what defined your effective PM program.

If you have done that, then you will still have roughly 25 – 30% of your work arising from failures that you’ve consciously decided can be allowed to run to failure. You do that because the consequences of those failures are tolerable – i.e.: they do NOT fit the description of emergency above.

In this situation, you can safely schedule all of your trades’ available time and leave nothing for “emergencies”.

Let’s say you aren’t there yet though. You have embarked on a program to define your PM program, to improve planning and scheduling and schedule compliance, but you aren’t there yet. In that case, congratulations – you are heading the right way. But you may still have urgent work arising. You may even have work that could be allowed to run-to-failure occur, but you treat it as urgent because you haven’t really analyzed the consequences of those failures and made a strategic choice.

In those circumstances, it does make sense to allow for some portion of urgent work arising. However, I would recommend that you keep that allowance well below your historical levels. If you have only 50% schedule compliance that means you have 50% of “emergency” work (whether it is true and emergency or not). I’d allow for 25% of work arising and schedule the other 75% of my work crews’ time. Get them used to working to a schedule on proactive work. Use overtime and contractors to deal with the overflow and continue to emphasize your efforts on planning, scheduling, PM program definition and compliance.

As those improve, the overtime and contractor spending will come down. In the meantime, they will show up in your financials and serve to keep the pressure on your improvement efforts. Think of it is short term pain for long term gain.

BOTTOM LINE: If you reduce the pain the short term, you are only dealing with symptoms of bigger problems, and doing nothing to solve the underlying causes.

Filed Under: Articles, Conscious Asset, on Maintenance Reliability

About James Reyes-Picknell

James is the best-selling author of “Uptime – Strategies for Excellence in Maintenance Management”, now in its 3rd edition, co-author of “Reliability Centered Maintenance – Re-engineered”, co-founder and Principal Consultant of Conscious Asset.

He is a Mechanical Engineer, graduate of the University of Toronto and has more than 44 years working in Operations, Maintenance, Reliability and Asset Management.

« Are You A High-Impact Leader?
Sturge’s Rule: A Method for Selecting the Number of Bins in a Histogram »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Conscious Asset series

Article by James Reyes-Picknell

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy