Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Robert (Bob) J. Latino Leave a Comment

Name That Failure Pattern (2)…

Name That Failure Pattern (2)…

This failure occurred on a turbine driven boiler feedwater pump (TDBFP) at a fossil fuel power plant. The pump in question is an outboard boiler feed pump. Plant is operating normally when unexpectedly pump shuts down and causes a forced outage.

Here is a basic process flow diagram for this process.

When investigators were able to safely access the failed components, the following was found:

1.      All inboard components are detached (see below)

2.      Pump had lift and could be rotated by hand

3.      Strainer was not in place

4.      Turbine driven boiler feedwater pump (TDBFP) opened and no damage was evident (including no damage to impeller and/or housing)

Here is a full picture of the coupling (pics in the heading seem to get cut off by LI limitations).

Given the limited preliminary physical data provided, what anomalies do we see, that need to be explained?

UPDATED POST 5.31.17 (ID# TDBFP.5.24.17)

Why were there different grade bolts as well as balancing weights on the coupling?

Here is the summary path(s) to failure for the boiler feed water pump case study above.

1.      ‘Procedure/specs for coupling fasteners were inadequate’ & ‘No QC inspection required during installation/repair’ [Latent Root Causes/Organizational System Related]>

2.      Results in ‘Field Selection Error’ when retrieving replacement coupling bolts [Human Root Cause/Decision Error Related] >

3.      Results in wrong bolts installed in the coupling [Physical Root Cause] >

4.      Results in inappropriate bolt coming loose and locking up turning gear>

5.      Results in pump being overloaded>

6.      Results in coupling failing>

7.      Results in pump failing to act as a primary mover>

8.      Results in turbine driven boiler feed pump to shut down in operation>

9. Results in plant tripping due to loss of boiler feed water

This is a summary of one of the paths to failure; to view the full RCA, please review the Boiler Feed Water RCA video case study on YouTube.

As always, all comments, suggestions, questions and debate are welcome!

Filed Under: Articles, on Maintenance Reliability, The RCA

About Robert (Bob) J. Latino

Robert Latino is currently a Principal at Prelical Solutions, LLC, along with his brother Ken Latino.  Bob was a Founder and CEO of Reliability Center, Inc. (RCI), until it was acquired in 2019.  RCI is a 50-year-old Reliability Consulting firm specializing in improving Equipment, Process and Human Reliability. Mr. Latino received his Bachelor’s degree in Business Administration and Management from Virginia Commonwealth University. 

« The Role of Statistics in Reliability Engineering
Routine Things Risk Becoming Routine »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

logo for The RCA article series image of BobArticle by Robert (Bob) J. Latino
CEO of Reliability Center, Inc.

in the The RCA article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy