Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)
The Central Artery/Tunnel Project, known as the Big Dig in Boston, selected probably the riskiest delivery method which helped cause the massive schedule and cost growth it experienced. The delivery method is called DBB (design bid build). This article is not about the Big Dig but it is about the risks involved in selecting a delivery method for your construction project. [Read more…]