Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
    • About Us
    • Colophon
    • Survey
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • CMMSradio
    • Way of the Quality Warrior
    • Critical Talks
    • Asset Performance
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Hero
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • NoMTBF
    • on Leadership & Career
      • Advanced Engineering Culture
      • ASQR&R
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Maintenance Management
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • RCM Blitz®
      • ReliabilityXperience
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Breaking Bad for Reliability
      • Field Reliability Data Analysis
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability by Design
      • Reliability Competence
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
      • Reliability Knowledge
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • The RCA
      • Communicating with FINESSE
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Institute of Quality & Reliability
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Statistical Methods for Failure-Time Data
      • Testing 1 2 3
      • The Hardware Product Develoment Lifecycle
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Special Offers
    • Accendo Authors
    • FMEA Resources
    • Glossary
    • Feed Forward Publications
    • Openings
    • Books
    • Webinar Sources
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • Your Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Live Courses
      • Introduction to Reliability Engineering & Accelerated Testings Course Landing Page
      • Advanced Accelerated Testing Course Landing Page
    • Integral Concepts Courses
      • Reliability Analysis Methods Course Landing Page
      • Applied Reliability Analysis Course Landing Page
      • Statistics, Hypothesis Testing, & Regression Modeling Course Landing Page
      • Measurement System Assessment Course Landing Page
      • SPC & Process Capability Course Landing Page
      • Design of Experiments Course Landing Page
    • The Manufacturing Academy Courses
      • An Introduction to Reliability Engineering
      • Reliability Engineering Statistics
      • An Introduction to Quality Engineering
      • Quality Engineering Statistics
      • FMEA in Practice
      • Process Capability Analysis course
      • Root Cause Analysis and the 8D Corrective Action Process course
      • Return on Investment online course
    • Industrial Metallurgist Courses
    • FMEA courses Powered by The Luminous Group
      • FMEA Introduction
      • AIAG & VDA FMEA Methodology
    • Barringer Process Reliability Introduction
      • Barringer Process Reliability Introduction Course Landing Page
    • Fault Tree Analysis (FTA)
    • Foundations of RCM online course
    • Reliability Engineering for Heavy Industry
    • How to be an Online Student
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
    • Accendo Reliability Webinar Series
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home
Home » Podcast Episodes » Rooted in Reliability: The Plant Performance Podcast » 268- Understanding & Communicating the Value of PMs with Rick Clonan

by James Kovacevic Leave a Comment

268- Understanding & Communicating the Value of PMs with Rick Clonan

Understanding & Communicating the Value of PMs with Rick Clonan

Welcome Rick Clonan who has been in maintenance for 30 years working both in defense and industry. More about Rick:

Currently at SMRP working as implementation and training manager.

In this episode we covered:

  • How do we communicate the value of PdM and PM?
  • What is/isn’t a PM?
  • What about PMs with instructions to “inspect and replace if necessary”?

How do we communicate the value of PdM and PM?
You have to set measurements for performance.

Consider the following:

  1. What is the reliability of the assets on which you perform the PM?
  2. How are you utilizing resources?

Combine the two to measure and communicate the value of PMs.

 

What is/isn’t a PM?
PM is the  intentional maintenance activities before failure. It may not take into account the current state of the machine but instead sticks to a schedule.

They include:

  • Adjustments
  • Cleanings
  • Lubrications
  • Non-distractive testing

 

What about PMs with instructions to “inspect and replace if necessary”?

  • It is not appropriate because it lacks a job plan for maintenance.
  • It also implies that you are only doing maintenance to find mistakes and not to prevent them.
  • Possibly means that you are under/over utilizing the resources at your disposal
  • PM not being done in a timely manner.
  • Intending to fix a problem you haven’t known its magnitude and impact means you will not prioritize your tasks appropriately.

PMs have to be intentional whether you find mistakes or not.

 

How do we know whether PMs are effective or not?

You have to measure it from two perspectives:

  1. Reliability: no unmanageable backlogs, delivering to customer (operations)
  2. Operations: Uptime, downtime, units delivered.

At SMRP we use PM Yield: Take the amount of corrective work found in PM and divide by PM work in hours to produce a ratio.

 

How do these help communicate the value of our PM?

  • Communicate the cost of reduced corrective work as a result of the PM.
  • PM should be 30% of the time, 60% corrective maintenance and 10% crafting.
  • Have a system that allows for recording the data i.e. what corrective work comes out of the PM alone.
  • Have closing codes; telling hours used and saved by the PM.

 

Do we look at PM to corrective maintenance ratio at an individual or macro level?

Always view it at a program level because its yield should be the same for all assets. Assess the program not the asset.

 

Have you ever heard of the 6:1 Rule?
Yes. It is a statistical tool for setting the frequency of inspection to find failures. Means that for 6 regular inspections should at least once reveal a given failure criterion.

  • Its utilization is based on a curve depicting failure data for a long period of time of repeated inspections yet what we want is a narrow curve (few regular inspections that reveal a failure criterion).
  • 6:1 rule is useful in critical systems to determine how a given number of inspections will capture a failure criterion.
  • However, it should only be used at a micro level (task-based) on a specific failure mode but not as an overall (macro level).
  • It is not programmatic.

 

Micro and macro metrics are often interchanged right?
Also, PM yield is not a macro-metric because even as you find work through PM, you should check its input to asset availability.

 

So should we view all these metrics together for the full picture?

Separately assess these two:

  1. PdM yield and PM yield separately.
  2. Asset availability I.e. downtime, uptime, maintenance between failures.

They could show:

  • High corrective work with low reliability- poor corrective practices.
  • Low reliability and low corrective work- excessive inspection with reasons for failure not being identified,
  • High reliability with low corrective work- PM optimization is low, reassess 6:1.
  • High reliability high corrective work- is right but if operation demand goes up then the time for inspection reduces.
  • High reliability with not too low/high corrective work is the best.

 

Do we have to stick to PM schedule to get the right measurements?

There is a 10% rule where you can always start two days prior to or after the scheduled PM date.

Some may do PMs at any time in a month but this implies they won’t be well spaced and won’t stick to 6:1 rule.

 

How do we link all these to get operation’s cooperation?

  • PM needs support from other functions such as planning and scheduling.
  • Create a structured corrective work in your CMMS from structured PM based on failure PM tasks.
  • Structured corrective work then goes to backlog and feeds planning and scheduling process and execution process as operational capacity is provided.
  • Use terms that concern operations for them to understand.

 

With all these we can then communicate?

  • Maintenance teams have to learn to communicate in quantities that concerns operations.
  • Communicate that reactive corrective work is more costly than planned downtime

 

What makes the biggest difference?

Communicate PM outputs in terms of asset availability, uptime, product losses, overhead labor costs.

 

Key takeaway

  • Communicate value of PM
  • Asses PdM , PM yield, 6:1 Rule
  • Look at reliability
  • Look at resource utilization
  • Have structured work order type in CMMS

 

Eruditio Links:

  • Eruditio
  • HP Reliability
  • James Kovacevic’s LinkedIn
  • Reliability Report

Bennett Fitch Links:

  • Eruditio
  • Rick Clonan Linkedin
  • Eruditio Linkedin
  • SMRP.org
  • Leading Reliability Conference
  • Book: Engineer’s Guide to Preventive Maintenance By Rick Clonan
  • Book: Maintenance & Reliability Best Practices by Ramesh Gulati
  • Book: Making Common Sense Common Practice by Ron Moore
Rooted in Reliability: The Plant Performance Podcast
Rooted in Reliability: The Plant Performance Podcast
268- Understanding & Communicating the Value of PMs with Rick Clonan
Loading
00:00 /
RSS Feed
Share
Link
Embed

Download filePlay in new window

Download RSS iTunesStitcher

Rooted In Reliability podcast is a proud member of Reliability.fm network. We encourage you to please rate and review this podcast on iTunes and Stitcher. It ensures the podcast stays relevant and is easy to find by like-minded professionals. It is only with your ratings and reviews that the Rooted In Reliability podcast can continue to grow. Thank you for providing the small but critical support for the Rooted In Reliability podcast!

Filed Under: Rooted in Reliability: The Plant Performance Podcast, The Reliability FM network

About James Kovacevic

James is a trainer, speaker, and consultant that specializes in bringing profitability, productivity, availability, and sustainability to manufacturers around the globe.

Through his career, James has made it his personal mission to make industry a profitable place; where individuals and manufacturers possess the resources, knowledge, and courage to sustainably lower their operating costs.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Rooted in Reliability podcast logo

The plant performance podcast

image of James Kovacevic
by James Kovacevic


Subscribe and enjoy every episode
Google
Apple
Spotify

Join Accendo

Receive information and updates about podcasts and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy

Book the Course with John
  Ask a question or send along a comment. Please login to view and use the contact form.
This site uses cookies to give you a better experience, analyze site traffic, and gain insight to products or offers that may interest you. By continuing, you consent to the use of cookies. Learn how we use cookies, how they work, and how to set your browser preferences by reading our Cookies Policy.