Accendo Reliability https://lucas-accendo-site-speed.sprod01.rmkr.net/podcast/the-reliability-fm-network/sor-517-compliance/ Wed, 26 Jul 2023 20:08:16 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.2 © 2025 FMS Reliability Illuminated Reliability Engineering Knowledge Accendo Reliability Illuminated Reliability Engineering Knowledge Accendo Reliability fms@fmsreliability.com No SOR 517 Compliance https://lucas-accendo-site-speed.sprod01.rmkr.net/podcast/the-reliability-fm-network/sor-517-compliance/ https://lucas-accendo-site-speed.sprod01.rmkr.net/podcast/the-reliability-fm-network/sor-517-compliance/#respond Thu, 05 Mar 2020 11:27:51 +0000 https://accendoreliability.com/?post_type=podcast&p=335358 SOR 517 Compliance

Abstract

James discusses the struggle to implement a program when access to the equipment being limited.

Key Points

Join James as he discusses the need to understand motivations to help with PM compliance.

Topics include:

  • Assigning the appropriate metrics in order to encourage the appropriate behavior.
  • PM Compliance owned by operation managers helps improve access for PMs
  • Understanding the motivations – helps to align metrics and KPIs that help everyone

Enjoy an episode of Speaking of Reliability. Where you can join friends as they discuss reliability topics. Join us as we discuss topics ranging from design for reliability techniques to field data analysis approaches.


SOR 517 ComplianceJames Kovacevic
  • Social:
  • Link:
  • Embed:

Show Notes

 

]]>
https://lucas-accendo-site-speed.sprod01.rmkr.net/podcast/the-reliability-fm-network/sor-517-compliance/feed/ 0 SOR 517 Compliance Abstract James discusses the struggle to implement a program when access to the equipment being limited. Key Points Join James as he discusses the need to understand motivations to help with PM compliance. Topics include: Assigning the appropriate metrics in order to encourage the appropriate behavior. PM Compliance owned by operation managers [...] No No 0:00 James Kovacevic compliance