Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg Leave a Comment

Purpose of a Reliability Program

Purpose of a Reliability Program

The reliable performance of a system is important. It is important to the customer, to our business and to us.

Very few argue that we should ignore the reliability characteristics of a product. We also deem cost, time to market or feature set as important also. The trouble is we can measure the latter directly every day, where the reliability performance is often difficult to measure.

Without feedback on progress toward our goals, we tend to make decisions less on reliability and more on the priorities we can measure. To ensure decision making include suitable reliability performance information is the purpose of your reliability program. To enable informed decisions across your organization

There are three elements we need to include sufficient reliability information to decision makers:

  1. What will fail?
  2. When will it fail?
  3. Cost (impact) of failure.

Let’s briefly explore each of these in the context of a reliability program and how this information influences decisions.

What will fail

Design engineers naturally consider the potential use of a device and the likely weaknesses of the design.

The intent is to provide the desired functions without failure. Even for relatively simple products, there are hundreds of potential failure mechanisms competing to cause the device to fail.

The reliability engineering tools of risk prioritization and discovery combine with engineering knowledge to identify the most serious and likely failure mechanisms. The reliability program should include a culture that enjoys and rewards finding failures. It is with knowledge of failures that the decisions to make improvements can occur.

Product testing should focus on testing to failure and thorough failure analysis. It is the detailed information on the root cause of failures, that provides the necessary information to consider appropriate remedies. Without failures the design team is left to speculate which design elements may require improvement. In some cases, modeling and simulation replace prototype testing, which should be supplemented with material and component level reliability characterization.

It is the awareness of what may fail, along with tangible evidence of what actually fails, the starts the discussion on reliability improvements.

The reliability program supports creating detailed knowledge of the failure mechanisms with infrastructure (tools and methods). The work to find failures requires a culture where finding failures is a desired and celebrated activity.

When will it fail

Knowing what will fail may provide too many opportunities to improve the reliability performance of the design.

One key element of information is the expected time before the failure mechanism will lead to failure. A faulty assembly or inadequate design may lead to early life failures in every device. Or a selected component may degrade in performance slowly leading to failure after many years of operation.

Knowing when a failure will occur provides information enabling prioritization of which failure mechanisms require attention. Some may require changes in materials or components, some may require adjustments to the assembly process, and others may require addressing diagnostic and repair capabilities.

The reliability program should support the exploration of the failure mechanisms time to failure behavior.

This includes modeling, simulation, environmental and use characterization, along with accelerated life testing for materials, components, and assemblies. The program infrastructure includes a mix of modeling and laboratory resources. The program enables the team to estimate the time to failure distribution for the most likely failure mechanisms.

The reliability work reduces uncertainty concerning when failures may occur or under what scenarios failures may occur.

Cost of failure

Not all failures are the same.

Some cause catastrophic damage other will lead to no perceptible change in product performance. When a failure occurs may also change the resulting cost of the failure. Early failures often damage brand reception and may lead to reduced market acceptance. Failure during the warranty period increases financial obligations. Failures at any time increase the cost of ownership of the customer.

Ideally, the reliability program includes the infrastructure and support to estimate the total cost of a failure.

The cost information should range from the direct cost of the failure (reset time of a system, component replacement, system replacement) to the impact of the customer (lost sales, for example) and the impact on customer satisfaction. In some markets, the increased risk of liability or recalls is also a factor.

The reliability program creates both the ability to estimate the costs and to place the risks in an appropriate content and perspective.

If there is a finite chance of an expensive failure, the information should be clear and useful for the decision makers to evaluate.

Summary

It is the combined knowledge of failure mechanisms, time to failure probabilities along with financial impact estimates that create clear information for decision makers across the organization.

Knowing only one element is not sufficient to properly balance the risks and options to make the right decision.

Each product and market is different, yet the ability to make informed decisions considering the reliability performance of your product does not. The reliability tools, methods, and culture employed are a direct result of the reliability program.

Keep in mind that each element of your program has a role to play in address one or more of the three elements discussed above.

When all three elements are regularly discussed and addressed by teams across the organization then your program will be successful.

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability Tagged With: goals

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« What do we know given MTBF?
How to Estimate MTBF »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy