Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg Leave a Comment

The Quality Triangle and Reliability

The Quality Triangle and Reliability

The quality triangle is an admission that every project has design constraints. Note that reliability is rarely listed directly within the triangle, yet reliability does impact each element of the triad.

In a world where the design team is beset with numerous design for X priorities, understanding how reliability related to the top three and most common set of constraints is imperative.

For any set of priorities, you should be able to convey how addressing reliability performance in the design and assembly process impacts those priorities. Addressing reliability can improve quality, reduce the risk of launch delays, and reduce the cost of a product. All this and improve customer satisfaction as well.

Let’s explore a few ways you can connect reliability priorities to the common quality triangle priorities.

Reliability and Quality

Where you consider reliability as quality over time or that reliability is just one facet of quality, they are intertwined. The perception of quality may take on many elements, such as the industrial design, the color, texture, speed, performance, and may include aspects of wear and durability.

The impact of out of box failures could be classified as a quality or reliability issue. I call it a reliability issue as it costs money in the form of warranty expenses and lost future sales. Avoiding or minimizing field failures allows the other features of a product’s design to satisfy customer’s needs. A failure to start, or function as intended, is a reliability issue and thwarts customer needs satisfying.

Reliability and Time (Deadlines)

A common pushback for reliability plans is, ’it will take too long and delay the program launch’, thus not supported. FMEA’s and HALT both take little time and yield insights on high priority items to address to improve reliability performance. ALT is some cases provide vital information and may take months to get results.

In both cases, as with many other reliability methods, conducting these activities earlier than later permits then to actually reduce the chance of a late in the program discovery of a launch delaying reliability issue. Relying on late in the development cycle prototype testing is nearly always a great way to discover problems that require redesign and program delays (or the issues are ignored and re-discovered by customers as a much high cost).

Front loading reliability work in the product development lifecycle improves reliability performance and reduces the risk of program delays.

Reliability and Cost

Reliability activities take time, resources, and cost money to accomplish. The investment in the development process is often budget constrained. Furthermore, the cost of each product, the bill of material costs is another common cost constraint. Keeping per unit costs down to permit a lower price point for sales, and/or improves the profit margin per unit sold.

Investing in reliability work may require expensive prototype testing or the use of more costly components to improve robustness. Both run counter to the desire to control costs.

Expand the discussion to include total lifecycle costs, and now these investments are prudent. It is which costs we focus on that matters. I suggest as many others do that the total life-cycle costs are what really matters.

Remember that field failures cost customers money under the warranty or lost sales cost us money. These are not always easy to measure or forecast, yet the necessary to make informed decisions concerning adding expense to a product during development.

Understanding the value of reliability investments will help you support the cost constraints while investing in improving reliability performance.

Summary

The quality triangle is a tool to assist the shepherding of development process toward product launch. While reliability is not named directly, reliability engineering activities impact each element of the priority triad.

Understanding the team’s priorities and how reliability engineering can support each priority will help ensure your team invests the proper amount of effort into achieving reliability objectives.

Above are just a few ways reliability connects and supports priorities of quality, time, and cost. What other connections do you know about? Leave a comment to describe how you achieve reliability objectives given the set of priorities for the development process.

Filed Under: Articles, CRE Preparation Notes, Reliability Fundamentals, Reliability Management Tagged With: Interrelationship of safety quality and reliability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Understanding Design Constraints
Rethinking Risk and Uncertainty »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy