Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins 1 Comment

Risk and Poka-Yoke

Risk and Poka-Yoke

Guest Post by James Kline (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

On March 28, 1979, there was a cascading failure in reactor number 2 at Three Mile Island.

This failure allowed large amounts of nuclear reactor coolant to escape. The accident coalesced the anti-nuclear movement and ultimately caused the decline in nuclear plant construction in the United States.

Three Mile Island

As described by Wikipedia, the accident “began with failures in the non-nuclear secondary system, followed by a stuck-open pilot-operated relief valve in the primary system”.

Analysis also showed that the valves of two backup pumps were left closed by maintenance. A warning light, which would have alerted the operator of the closed valves, was obscured by a maintenance tag.

While the problem was partly blamed on human error and a lack of training, it was also a result of the complexity of the control panel. There were over 750 lights, each with a letter code, some of which had the related flip switches nearby, while others are far away.

Because of the incident at Three Mile Island, the control panels have been modified with color codes.

The purpose of the color coding is to help operators, in a moment of extreme stress, flip the correct switches.  This mistake-proofing is the idea behind Poka-yoke. Color coding is a common Poka-yoke practice.

Poka-yoke 

Poka-yoke is the Japanese term for mistake proofing. It is a fundamental quality tool. Poka-yoke actions are designed to: eliminate the opportunity for error; detect the potential for error and prevent the error. This is fundamentally the same objective as the Risk Analyst.

It is a fundamental quality tool. Poka-yoke actions are designed to: eliminate the opportunity for error; detect the potential for error and prevent the error. This is fundamentally the same objective as the Risk Analyst.

This is fundamentally the same objective as the Risk Analyst.

The common objective means that the Poka-yoke framework, while quality oriented, can be useful to the Risk Analyst. Under Poka-yoke mistakes are classified into four categories. These are listed below.

Poka-yoke mistakes are classified into four categories. These are listed below.

1. Information Errors

  • Information is ambiguous.
  • Information is incorrect.
  • Information is misread, misinterpreted or mismeasured.
  • Information is omitted.
  • There’s inadequate warning.

2. Misalignment

  • Parts are misaligned.
  • A part is misadjusted.
  • A machine or process is mistimed.

3. Omission or commission

  • Material or part is added.
  • Prohibited and/or harmful action is performed.
  • Operation is omitted.
  • Parts are omitted, so there’s a counting error.

4. Selection errors

  • A wrong part is used.
  • There’s a wrong operation.
  • There’s a wrong orientation.

As with all methods or schemas, application needs to be adjusted to the specific situation or circumstance. However, this schema does provide a useful framework for analyzing both quality and risk.

Poka-yoke is one example of the overlap between Risk and Quality Analysis.


 

Bio:

James Kline Ph.D. is an ASQ certified Six Sigma Green Belt and Manager of Quality/Organizational Excellence. He has over ten years supervisory and managerial experience. He has consulted on economic, quality and workforce development issues for the City of Corvallis, Benton County Oregon, the State of Oregon and the League of Oregon Cities. He has also published numerous articles related to quality in government.


Related:

Reliability Management and Risk (article)

Reliability Risk Reduction Tools (article)

 

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« The Next Step in Your Data Analysis
A Fault Finding a Technique that Works »

Comments

  1. Starli Brighton says

    December 14, 2022 at 5:49 PM

    How great to know that the Poka-yoke framework is useful to a risk analyst. I am starting a new business this year in the industrial field. I will find a good place for machine tool coolant pumps as well for this locally.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy