Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Ray Harkins Leave a Comment

Root Cause Analysis — What is 8D?

Root Cause Analysis — What is 8D?

The “D” is 8D stands for “disciplines”, and the 8D process is a problem-solving methodology employing eight sequential disciplines or steps that can be applied to a wide range of industries, situations, and disciplines.

The 8D process was developed in the late 1980’s by the Ford Motor Company to give its engineers a standardized method for dealing with design and manufacturing problems. Ford’s predecessor to 8D was called “TOPS”, Team Oriented Problem Solving. This is a fitting name to the methodology since it strongly emphasizes a team-based approach. In fact, the first of the eight D’s is “Assemble the Team”.

The second D is “Describe the Problem”. As former president of General Motors, Charles Kettering tersely said, “A well-stated problem is half solved.” At this step of the process, the failure is analyzed, the data is collected, and the observations are made. This critical fact-finding phase sets the stage for the rest of the process.

The third D is the “Interim Containment Response”. These are the steps to “stop the bleeding”. Recalls, onsite sorting and 100% inspection typically fall under the umbrella of containment. In industries where a very high level of customer satisfaction is paramount, containment is often the most critical step in the process. While containment actions don’t fix problems, they do shield the customer from further effects of the supplier’s shortcoming.

The fourth D is “Root Cause Analysis”. This is where tools like capability analysis, the Ishikawa diagram, control charting, 5 Why Analysis, and Measurement System Analysis tie together the inputs of a process to the unintended outputs. By identifying the true root causes, your efforts moving forward to improve the process will yield your intended results.

The fifth D is “Determine the Corrective Action Plan”. This is the step where your understanding of the process, and your knowledge of improvement tools and strategies come together to permanently reduce or even eliminate the defect. It’s not good enough to just have a clear picture of the problem, you must have access to potential solutions as well. This access comes through experience, benchmarking, supplier support, established improvement strategies and a host of other sources.

The sixth D is closely related to the fifth, “Implement Corrective Actions”. Even though the corrective action for a defect is accessible, it may take different types of effort to implement the right solution. This is where project management techniques, soft skills, and networking pay off most in the 8D process. Negotiating, planning, training and communicating often complement the “hard” skills of problem solving to fully implement the solution.

The seventh D is “Implement Preventive and Parallel Actions”. This is where the hard work you investing into the first six D’s is multiplied by applying the same improvement across multiple product lines, machines or departments.

And lastly, the eighth D is “Thank the Team”. Successfully implementing a corrective action is truly a reason to celebrate and to acknowledge the contributions of others. It is common at this step to make a presentation of the improvement project to the executive team. Acknowledging others’ contributions also feeds the culture of continuous improvement and encourages those same people to take on new challenges.

A deeper dive into the 8 D’s, plus dozens of tips and tools like this are available in the online classes “Root Cause Analysis and the 8D Corrective Action Process”.

Filed Under: Articles, on Tools & Techniques, The Manufacturing Academy

About Ray Harkins

Ray Harkins is a senior manufacturing professional with over 25 years of experience in manufacturing engineering, quality management, and business analysis.

During his career, he has toured hundreds of manufacturing facilities and worked with leading industry professionals throughout North America and Japan.

« How to Use CMMS to Improve OEE and TEEP
Myth Busting 8: Who should schedule work »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Logo for The Manufacturing Acadamey headshot of RayArticle by Ray Harkins
in the The Manufacturing Academy article series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Posts

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy