Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg 1 Comment

Statistical Process Control Overview

Statistical Process Control Overview

Basic introduction to key concepts of SPC

Statistical process control (SPC) is not a control chart alone.

SPC is a set of tools and a thought process to identify, measure, monitor and improve important elements of product development and production. I’ve seen very good and very bad implementations of SPC.

Control Charts behind glass

Once during a visit to a component vendor the host proudly waved his hand toward a large display board with various tracking metrics charted along with a range of control charts. The paper was carefully lined up and arranged with appropriate headings. The control charts were printed (not hand created) and looked neat and professional.

Being new to audits and having recently learned about and started using control charts myself I stepped in for a closer look. Keep in mind this was in a hallway near the offices and meeting rooms, not within sight of the production equipment. The first thing I noticed was the date on the first control chart was from a previous month. Second, even with over 100 sets of readings posted, nothing indicated an out of control situation. The chart had no notes.

Not for use, just for show

As the tour continued we visited the production line and I asked about the station where the measurements were made for the control charts we had seen. The response was a bit surprising. “Oh, we do that here! Once a month an engineer pulls data from the automatic testing equipment along the line and from QC and prepared the QC report including the control charts.

“So, how do the production operators know when something is out of control?” I asked.

“We don’t have out of control problems!” was his response, and he quickly moved along the line to the next station.

It became clear that the control charts were not for use, just for show. Previous customers expected to see control charts, so they displayed control charts.

I’ve seen this approach in numerous factories and the rationale ranges from the charts are a management tool to monitor production to not wanting to permit production operators to shut down the line if there is an issue (have to make the shipment quota).

Smudged and stained charts

In a rare factory, we find a control chart actually in use at the point of measurement. The best example I recall was a paper X-bar and R chart along a solder paste height measurement instrument. One of the checks for solder paste is the slump and it indicates the need to replace the solder paste in the deposition equipment before poor solder joints are formed downstream. The measurement equipment quickly made measurements of a sample (off-line from the production flow) and provided the average and range values to the operator. The operator would then note the values on the control chart by hand.

The solder paste equipment was relatively new and recently received some engineering upgrades. The control charts were there to monitor the equipment, judge the effect of the improvements, and to spot any issues as soon as possible. The production operator explained as he made the reading. Impressive.

Not for show, just for use

The chart did have an out of control indication which was circled and a note indicating the equipment status and situation. Inspecting the solder sample they found some debris on the circuit board that may have caused the unwanted change in paste height and after a quick call to production engineering, they decided to continue production. The line was down for less than 5 minutes and did not impact production throughput.

Later we discussed with the manufacturing engineers the control chart on the solder paste equipment. They set up the measurement equipment and control chart to learn something. They wanted to know if the changes were stable and made an improvement. The control chart, in their opinion, was a good tool in this situation.

The Process of Statistical Process Control

Production processes have variation and it is unavoidable. Identifying and monitoring the variability that impacts the quality or reliability of production is an ongoing process. Using risk assessment tools, like FMEA, along with engineering judgment helps the team to identify areas to measure. The intent is to create production processes that are stable, which means the variation over time does not change dramatically. Then the team can monitor the process looking for both good and bad indicators. Out of control can be something that creates a better product (less variation or improved performance, for example) or it may indicate something has changed for the worse.

It is the immediate monitoring that helps the production team to identify the causes of any changes. The shorter the feedback loop, i.e. on the production line, the better. The intent is not to create a chart for display behind glass, the intent is to learn about the statistical behavior of a measurement.

Analyzing your measurements

The comparison of the actual measurements to the specification leads to the calculation of process capability measures. If the process is stable and produces products within expected specification even with the expected amount of variation, then the process is considered capable. When the process is not capable, control charts provide information useful for process or design improvements. Tools such as hypothesis testing or design of experiments are also useful to determine improvements, then control charts provide information of results.

It is the thought process of identifying, monitoring, and improving the design and production process and it is the ongoing work to find and manage the variation that will occur within the system. Variation happens. Understanding it leads to a stable and predictable production process.


Related:

Selecting Control Charts (article)

Introduction to Control Charts (article)

Pre-Control Charts (article)

 

Filed Under: Articles, CRE Preparation Notes, Probability and Statistics for Reliability Tagged With: Statistical Process control (SPC) and process capability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Difference between hazard and failure rate
Is MTBF better than nothing »

Comments

  1. Germaine Koziarski says

    September 28, 2014 at 3:18 PM

    Very interesting article! Thanks Fred for sharing this helpful information on SPC! I will start my research to see how SPC can help my business.

    Thanks again! 🙂

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CRE Preparation Notes

Article by Fred Schenkelberg

Join Accendo

Join our members-only community for full access to exclusive eBooks, webinars, training, and more.

It’s free and only takes a minute.

Get Full Site Access

Not ready to join?
Stay current on new articles, podcasts, webinars, courses and more added to the Accendo Reliability website each week.
No membership required to subscribe.

[popup type="" link_text="Get Weekly Email Updates" link_class="button" ]

[/popup]

  • CRE Preparation Notes
  • CRE Prep
  • Reliability Management
  • Probability and Statistics for Reliability
  • Reliability in Design and Development
  • Reliability Modeling and Predictions
  • Reliability Testing
  • Maintainability and Availability
  • Data Collection and Use

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy