Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Mike Sondalini Leave a Comment

Tracking Large Rotating Equipment

Tracking Large Rotating Equipment

What you will learn from this article.

  • The importance of using datum for aligning kilns.
  • How to set-up the necessary datum.
  • The effect of trunnion alignment on the behavior of the kiln.
  • How axial float is achieved by skewing the trunnions.
  • Rotary dryers, kilns, mills, and reactors turn on tyres and trunnions.

Each tyre is mounted to the rotating shell and revolves on two roller trunnions. The shell is rotated mechanically.

Generally, the tyres and trunnions are made of steel but in lightweight equipment with low rolling surface temperatures, the trunnions can be lined with hard wearing plastic. In those situations where the product is continuously fed through the equipment, the entire shell is inclined a few degrees.

With each rotation, the product is lifted and moved along a distance.

The rotating shell is aligned by correctly positioning of the tyres and trunnions. Guide rollers are fitted to the front and back of a tyre and trunnion set to limit axial movement.

If the alignment between the tyre and trunnions is lost due to wear, poor repair, installation error or impact, the equipment will need to be tracked

Axial alignment

Installation and maintenance personnel will flounder when tracking the tyres without proper references to align the equipment.

Proper tracking of rotary equipment requires access to a datum from which the axial alignment of the tyres can be set. The datum is a series of points whose relative vertical and horizontal positions are accurately known.

Figure No. 1 show how the datum is used to set the vertical and horizontal position of the tyres.

V1E2-2-1

Figure No. 1 Vertical and horizontal datum.

Unless the equipment manufacturer or installer provided the datum’s, you need to be creative in establishing the necessary reference points.

One method that proved suitable on a rotary reactor was to use laser surveying to establish both the vertical heights of the trunnion pedestals under each tyre and to position a datum line offset from the tyre axis to provide horizontal reference points. This allowed accurate measurement of the horizontal and vertical position of each tyre axis to within 0.5 mm.

Drawing No. 2 shows how the hold down bolts were used as a horizontal reference on the assumption that the pedestals were cast identical and had been properly aligned when the equipment was originally installed.

The numbers in the circles represent the vertical datum and show that all but one end of one pedestal were at the same level. The “marks on the concrete floor” distance represent the offset from the hold down bolts to give the horizontal alignment.

Provided the drive alignment can be adjusted it is simpler to line up the tyres and trunnions to the datum and then align the drive to the shell.

V1E2-2-2

Drawing No. 2 Locating horizontal datum

Rolling Face Alignment (Training the kiln)

A further consideration in tracking large rotating equipment is the alignment of the trunnions to the tyre. The tyre and trunnion must always be aligned with each other. Where the shell is inclined the trunnions must also be inclined to the same angle.

If the rollers are set skew to the tyre axis forces are created which drives the shell along its axis. This can advantageous and necessary if the shell requires ‘floating’ between the axial guide rollers, but otherwise, leads to unnecessary wear.

Misalignment between tyre and rollers can cause excessive wear of the rolling faces because the previous line contact between the two surfaces becomes a highly stressed point contact. Offsetting one trunnion pair from the other will cause twisting of the shell.

Drawing No. 3 highlights the problems caused by rolling face misalignment.

V1E2-2-3

Drawing No. 3 Contact stress changes due to trunnion alignment.

Correct tracking of rotating dryers, kilns and reactors is achieved by first aligning the tyre and trunnion sets axis true to each other.

It is easier if all trunnions are the same diameter otherwise compensating calculations have to be made for each differently sized trunnion. The shell and tyres are lowered or raised by jacking the trunnions respectively out or in.

Axial trusting is then removed by giving the trunnions a minuscule amount of offset relative to the tyre axis.

Axial ‘float’ adjustments are done by jacking alternate sides of each trunnion pair in or out depending on which direction the float is required.

A ‘rough-in’ adjustment can be done while the shell is cold but the final setting must be done at operating temperature while under load.

Drawing No. 4 shows one of the two possible orientations of the trunnions to create axial movement of the shell. One way to understand what the trunnion offsets do is to think of the shell with an imaginary helical ‘thread’ on its outside. By skewing all four trunnions minutely they act like a nut running along the ‘thread’. But since the trunnions are stationary it is the shell that gets the thrusting action from the trunnions and moves along the ‘thread’.

To select the trunnion bearing housing to be jacked stand behind the trunnion concerned, with the fingers of both hands pointing in the opposite direction to the rotation of the shell.

The hand with the thumb pointing in the direction the shell has to be steered is the same hand as the bearing housing that needs to be jacked minutely inward to the shell.

V1E2-2-4

Drawing No. 4 Offsetting trunnions to float the kiln

Set-up dial indicators at the shell end of each bearing housing to be jacked. Jack both bearing housings on each trunnion pair at the same time by equal amounts.

Move the bearing housings 0.025-mm (0.001”) at a time. Continue the equal adjustment till the tyre moves away from the axial thrust guide roller. As little as 0.1 mm (0.004”) can suffice to steer the shell.


 

Mike Sondalini – Maintenance Engineer

DISCLAIMER: Because the authors, publisher, and resellers do not know the context in which the information presented in the articles is to be used, they accept no responsibility for the consequences of using the information.


We (Accendo Reliability) published this article with the kind permission of Feed Forward Publishing, a subsidiary of BIN95.com

Web: trade-school.education
E-mail: info@trade-school.education

If you found this interesting you may like the ebook Centrifugal Pump Problems & Answers.

Filed Under: Articles, on Maintenance Reliability, Plant Maintenance

About Mike Sondalini

In engineering and maintenance since 1974, Mike’s career extends across original equipment manufacturing, beverage processing and packaging, steel fabrication, chemical processing and manufacturing, quality management, project management, enterprise asset management, plant and equipment maintenance, and maintenance training. His specialty is helping companies build highly effective operational risk management processes, develop enterprise asset management systems for ultra-high reliable assets, and instil the precision maintenance skills needed for world class equipment reliability.

« The “What” & “Why” of Weibull Analysis
When to Incorporate a Risk into the Baseline Schedule or Risk Register »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by
Mike Sondalini
in the
Plant Maintenance series articles provided courtesy of Feed Forward Publications and Lifetime Reliability Solutions.

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy