Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Greg Hutchins Leave a Comment

Unaddressed Risk

Unaddressed Risk

Guest Post by Paul Kostek (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

What’s the risk of not addressing a risk?  What happens on a project when a risk is identified and not addressed/mitigated?    There may be reasons not to correct it, e.g low probability of occurrence and minimal impact,  but how do we document and track this decision?  And if we’re delaying an implementation how do we insure the risk is addressed at a later date, e.g. next version release?   How do we insure that if an audit takes place the project team can clearly explain the reasons for the decision?  Is this even acceptable?
We spend so much of our time looking at risk, its potential impact and how we can mitigate it, is there a time when it is acceptable to note a risk and then move on without addressing it?  Certainly,  if is low impact/probability and the mitigation required will take longer and cost more than the risk then it can be acceptable to document the risk, the results of the analysis,  and the decision to take action at a later date.  This should be documented in the project’s Risk Management Plan.  We also have to acknowledge that in some cases when we say later, can end up be never depending on the products future.

So if a risk falls in the white, green or yellow risk areas on the sample risk chart below – we can likely justify taking no action.

We will need to document the reasons we decided not to address an identified risk and also make sure that we include any analysis for risks in the minor and moderate categories.  As mentioned earlier these results should be included in the project Risk Management Plan. The details can be documented in an internal memo/design decision memo/etc, but the decision should be kept in the Plan.

Moving into the major and extreme categories, any risk not addressed will need not just documentation but management approval.   In these cases we’d likely be invoking ALARP – as low as reasonably practicable – as the reason for not addressing a risk.  Any time ALARP is used we’re saying the cost of reducing the risk would not be disproportionate to the benefit gained.   It’s all about identifying and understanding the project risk versus the benefit of the system that is being produced.

Whether formally addressed in the design or left open,  as a project moves forward the decisions made on risk must be documented and recorded for future use.

Bio:

Paul J. Kostek is a Principal of Air Direct Solutions, a systems engineering/project management consulting firm. He works with companies in defining system architecture, system requirements, interface definition, verification planning, risk management and software development standards. Paul received his BS from the University of Massachusetts, Dartmouth.   Paul works in a range of industries including: aerospace, defense, medical device and e-commerce.

Paul is a long-time volunteer with several professional engineering societies including IEEE, AIAA, SAE, INCOSE and PMI.  He also writes for the CERM.

 

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety Tagged With: Risk Management Plan

About Greg Hutchins

Greg Hutchins PE CERM is the evangelist of Future of Quality: Risk®. He has been involved in quality since 1985 when he set up the first quality program in North America based on Mil Q 9858 for the natural gas industry. Mil Q became ISO 9001 in 1987

He is the author of more than 30 books. ISO 31000: ERM is the best-selling and highest-rated ISO risk book on Amazon (4.8 stars). Value Added Auditing (4th edition) is the first ISO risk-based auditing book.

« Shaft Coupling Selection Issues
Selecting the wrong ALT model »

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CERM® Risk Insights series Article by Greg Hutchins, Editor and noted guest authors

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy