Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

by Fred Schenkelberg 2 Comments

Use a Delta Program to Minimize Early Field Failures

Use a Delta Program to Minimize Early Field Failures

Failures happen. Sometimes product failures happen quickly.

You just bought a new feature rich computer and discover it doesn’t work. Right out of the box, it will not power up. Conversations with the tech support and it’s a trip back to the store.

The failures that occur early the in the life of a product tend —

this ‘tend’ really is just a vague ‘in general’

…tend to occur because of manufacturing errors or shipping/installation damage.

Not always, though.

The Delta Program

Years ago a company was struggling in the market. The product reliability was not very good compared to the competition and the market knew this and bought accordingly. The product design team worked to bring out a new product with many reliability enhancements.

Yet, they did not know if that would be good enough. So they focused a small part of the core design team on the first few months of field returns. Once they went into production and started selling units, this team received nearly all of the reported field failures.

The intent of the Delta program was to keep a team of development engineers on the program even after it had been released to the market. The common practice was to move the engineers to the next development project.

The mandate for the Delta program was to find design errors and implement immediate design improvements.

They found power supplies that were not robust- inadequate electronic filtering, underpowered fans, and many other design flaws.

The result in less than two months from the initial shipment was a reduction of the field failure rate by over 50%, which then continued to decline with the normal process and design improvements.

Added benefit of the Delta Program

The company previous would work to improve the design and process as they discovered flaws. It took time for the manufacturing and new product introduction engineers to learn the details of the new product. It took time to consider and evaluate the suitability of solutions. They had reviews and a detailed approval process. Plus they generally rolled out improvements after the current inventory of components was consumed.

The Delta Program eliminated delays. They did some experimentation and evaluations. Did very quick reviews and implemented changes resulting in the rework of existing in-house inventory and scrapped components being replaced.

They shorten the time to field failure reduction. In other words, they cut the monthly warranty expense in half 6 months sooner than previous programs.

One more benefit of the Delta Program

The entire engineering team wanted to be on the next Delta Program. It was a fun and important (highly visible) position. The engineers on the team were recognized as product design experts within the organization and given the trust to implement significant changes to an existing design.

It was a fun and important (highly visible) position. The engineers on the team were recognized as product design experts within the organization and given the trust to implement significant changes to an existing design.

Plus they learned a lot. They learned about product failures first hand. They got to conduct extensive failure analysis and talk to customers. They improved their design skills dramatically, becoming even more valuable to the organization.

Notes on implementing the Delta Program

  • Select a small team representing the major elements of the product. They have to know the product. They need to know the theory of operation and how it actually works.

 

  • Get products back quickly. An overnight shipment is expensive, and not compared to the avoided cost of 100 other field failures. If possible have the team attend the installation of the product.

 

  • Give the team the tools to conduct detailed failure analysis. They need the equipment and skills to do chemical, thermal, vibration, etc. analysis quickly. If the failure analysis lab and technicians are not in house, establish a close relationship with a nearby lab. Remove the barriers to permit quick results.

 

  • Streamline the design review process. It is worth reviewing changes and considering all the impacts. Yet it can and should be the same day the proposed changes occur. Again, dedicate the people to make this happen.

 

  • At the start of production, any detected and unresolved issue the leads to field failures costs money and customer satisfaction.

 

Yes, the product should not have early field failures. It happens. There are just too many elements and consideration and unknowns to get the design perfect every time. A Delta Program pays for itself quickly and is worth adding to your next project.


Related:

Field Data and Reliability (article)

When to Take Action on Field Failure Data (article)

Failure Analysis: The Key to Learning from Failure (article)

 

Filed Under: Articles, Musings on Reliability and Maintenance Topics, on Product Reliability

About Fred Schenkelberg

I am the reliability expert at FMS Reliability, a reliability engineering and management consulting firm I founded in 2004. I left Hewlett Packard (HP)’s Reliability Team, where I helped create a culture of reliability across the corporation, to assist other organizations.

« Just Because the Customer Requests MTBF
Reliability and the Development Phase Gate Process »

Comments

  1. Gene Danneman says

    September 25, 2015 at 9:38 AM

    The Delta team is a great concept. In the continuous process industry, plant startups expose an amazing amount of design errors and early equipment failures that must be swiftly addressed to assure plant safety, environmental protection, reliability, production schedule and minimize financial risks. As a member of the team, expect long hours, lots of customer feedback, and being able to see and feel the results of effective problem solving. Root cause analysis, problem solving analysis and an effective failure reporting and corrective action program are critical.

    Reply
    • Fred Schenkelberg says

      October 17, 2015 at 2:22 PM

      Hi Gene,

      Took a while to respond to your excellent comment. Thanks for the comment which seems based on personal experience. You know how important it is to quickly address any issues so you can avoid other problems later. It’s an investment, yet well worth it.

      Cheers,

      Fred

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Article by Fred Schenkelberg
in the Musings series

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy