Accendo Reliability

Your Reliability Engineering Professional Development Site

  • Home
  • About
    • Contributors
  • Reliability.fm
    • Speaking Of Reliability
    • Rooted in Reliability: The Plant Performance Podcast
    • Quality during Design
    • Way of the Quality Warrior
    • Critical Talks
    • Dare to Know
    • Maintenance Disrupted
    • Metal Conversations
    • The Leadership Connection
    • Practical Reliability Podcast
    • Reliability Matters
    • Reliability it Matters
    • Maintenance Mavericks Podcast
    • Women in Maintenance
    • Accendo Reliability Webinar Series
  • Articles
    • CRE Preparation Notes
    • on Leadership & Career
      • Advanced Engineering Culture
      • Engineering Leadership
      • Managing in the 2000s
      • Product Development and Process Improvement
    • on Maintenance Reliability
      • Aasan Asset Management
      • AI & Predictive Maintenance
      • Asset Management in the Mining Industry
      • CMMS and Reliability
      • Conscious Asset
      • EAM & CMMS
      • Everyday RCM
      • History of Maintenance Management
      • Life Cycle Asset Management
      • Maintenance and Reliability
      • Maintenance Management
      • Plant Maintenance
      • Process Plant Reliability Engineering
      • ReliabilityXperience
      • RCM Blitz®
      • Rob’s Reliability Project
      • The Intelligent Transformer Blog
      • The People Side of Maintenance
      • The Reliability Mindset
    • on Product Reliability
      • Accelerated Reliability
      • Achieving the Benefits of Reliability
      • Apex Ridge
      • Metals Engineering and Product Reliability
      • Musings on Reliability and Maintenance Topics
      • Product Validation
      • Reliability Engineering Insights
      • Reliability in Emerging Technology
    • on Risk & Safety
      • CERM® Risk Insights
      • Equipment Risk and Reliability in Downhole Applications
      • Operational Risk Process Safety
    • on Systems Thinking
      • Communicating with FINESSE
      • The RCA
    • on Tools & Techniques
      • Big Data & Analytics
      • Experimental Design for NPD
      • Innovative Thinking in Reliability and Durability
      • Inside and Beyond HALT
      • Inside FMEA
      • Integral Concepts
      • Learning from Failures
      • Progress in Field Reliability?
      • R for Engineering
      • Reliability Engineering Using Python
      • Reliability Reflections
      • Testing 1 2 3
      • The Manufacturing Academy
  • eBooks
  • Resources
    • Accendo Authors
    • FMEA Resources
    • Feed Forward Publications
    • Openings
    • Books
    • Webinars
    • Journals
    • Higher Education
    • Podcasts
  • Courses
    • 14 Ways to Acquire Reliability Engineering Knowledge
    • Reliability Analysis Methods online course
    • Measurement System Assessment
    • SPC-Process Capability Course
    • Design of Experiments
    • Foundations of RCM online course
    • Quality during Design Journey
    • Reliability Engineering Statistics
    • Quality Engineering Statistics
    • An Introduction to Reliability Engineering
    • Reliability Engineering for Heavy Industry
    • An Introduction to Quality Engineering
    • Process Capability Analysis course
    • Root Cause Analysis and the 8D Corrective Action Process course
    • Return on Investment online course
    • CRE Preparation Online Course
    • Quondam Courses
  • Webinars
    • Upcoming Live Events
  • Calendar
    • Call for Papers Listing
    • Upcoming Webinars
    • Webinar Calendar
  • Login
    • Member Home

on Risk & Safety

A listing in reverse chronological order of articles by:



  • Greg Hutchins (editor) — CERM Risk Insights series

  • Doug Lehr — Equipment Risk and Reliability in Downhole Applications series

  • Sanjeev Saraf — Operational Risk, Process Safety series

by Greg Hutchins Leave a Comment

Dealing with Uncertainty in Your Risk Assessment

Dealing with Uncertainty in Your Risk Assessment

Guest Post by Andrew Sheves (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Most of the risk assessment models I’ve discussed before use a basic formula to calculate a value for risk. By adding or multiplying values for the individual factors, you’ll get a numeric value for the risk itself. That’s going to allow you to put things into order, apply a color-code or description. That gives you enough differentiation to start a risk-based discussion or determine where you need to focus your attention and resources.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Sanjeev Saraf 1 Comment

B.A.N.A.N.A – Build Absolutely Nothing Anywhere Near Anyone

B.A.N.A.N.A – Build Absolutely Nothing Anywhere Near Anyone

Citizens often oppose chemical process facilities near their community because of potential for high consequence events. This risk aversion of society is commonly referred to as NIMBY (Not-in-my-backyard). The risk aversion is based not by taking into account annual fatalities but based on potential worst-case catastrophe. Thus the main factor influencing risk perception is catastrophic consequence potential.

[Read more…]

Filed Under: Articles, on Risk & Safety, Operational Risk Process Safety

by Greg Hutchins 2 Comments

Quality Risk is a Major Reason for Project Failures

Quality Risk is a Major Reason for Project Failures

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

My contention is management many times compromises quality to mitigate budget and cost issues resulting in a major risk to the project.

How to minimize the quality risk on a project is addressed in this paper. The approach to do this is based on my 30 years of project and project risk management experience and knowledge. Let’s start with a story to illustrate my contention.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Smoke Alarms: How to Become More Proactive

Smoke Alarms: How to Become More Proactive

Guest Post by Andrew Sheves (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Many people have a few smoke alarms dotted around their house and, to me, these are some of the most straightforward set-it-and-forget-it risk management tools you can get. You set these up and then…nothing. You can forget about them until that annoying ‘chirp’ sound wakes you up one night, telling you to change the battery.

And most people will never hear their smoke alarm go off except for those times that their cooking gets a little out of hand.

However, if there were a fire, they’d know about it immediately and be able to react.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Cost Risk is a Major Reason for Project Failures

Cost Risk is a Major Reason for Project Failures

Guest Post by John Ayers (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Studies show most projects fail due to poor management of known risks. The known risks on a project are:

  1. Scope.
  2. Schedule.
  3. Cost.
  4. Quality.

Generally speaking, cost problems are due to insufficient budget, poor budget control, and poor planning. How to minimize the cost (budget) risk on a project is addressed in this paper. The approach to do this is based on my 30 years of project and project risk management experience and knowledge.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Agile ERM #3

Agile ERM #3

Guest Post by Howard M. Wiener (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In the previous article (Enabling Agile Enterprise Risk Management Part II: Disciplines) I identified the disciplines necessary to enable you to transform your enterprise at speed. At the conclusion of that article, I promised to present a design for a repository and system to support AERM.  This article will fulfill that promise.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Risk of Elusive Elephants in Decision Making

Risk of Elusive Elephants in Decision Making

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

This is not an article about an endangered species plundered to near extinction as trophies for big game hunters or being poached for its aphrodisiacal ivory or describing a mythical elephant’s graveyard…it’s about those metaphorical elephants that frequent rooms in political corridors of power, boardroom suites and project offices around the World.  Although these elephants are known to exist they are either not immediately recognised or conveniently avoided.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

What is a Black Swan and Why You Need Contingencies?

What is a Black Swan and Why You Need Contingencies?

Guest Post by Andrew Sheves (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

I’m sure you’ve heard people referring to COVID-19 as a ‘Black Swan’ – something that no-one could have seen coming – but is that actually the case?

Terrible though it is, I don’t think it’s accurate to describe the current situation as a Black Swan because we’ve had to deal with highly contagious, deadly diseases before.

Calling this a ‘Black Swan’ is, therefore, a way to excuse a confused response: ‘how could we have prepared for something that no-one could see coming?’

However, genuine Black Swan events do exist and we need to understand these because the consequences can be significant. It’s also useful to know what we can and cannot do to prepare for Black Swans due to the uncertainty that these involve.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Micro-management: Macro Risk?

Micro-management: Macro Risk?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Micromanagement is rarely praised but is sometimes very necessary.  When new operations commence and procedures are being developed, or there is a high degree of complexity, it is essential to get things right and ‘micromanagement’ comes into its own.  Training new people can require micromanagement until they get up to speed, understand an organisation’s processes and procedures, and develop any necessary experience.  Also, if there is a need for greater control over an operation requiring accurate performance metrics then micromanagement will be the order of the day.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Doug Lehr Leave a Comment

Failure Analysis – Mitigation

Failure Analysis – Mitigation

Failure Simulation has confirmed all root causes in the Storm Packer failure analysis. The focus is now on mitigations that prevent them from occurring again. 

Mitigations are controls that prevent failures or reduce their probability of occurring. Ideally, an OEM implements mitigations to the product through Design for Reliability (DfR) activities before commercialization. Some mitigations may be best practices in product design. Others may be best practices for installation or maintenance processes. Some have been acquired through FRACAS programs. However, all will be based on institutional knowledge.

[Read more…]

Filed Under: Articles, Equipment Risk and Reliability in Downhole Applications, on Risk & Safety

by Greg Hutchins Leave a Comment

Speaking Up is Hard (Especially) for Risk Managers

Speaking Up is Hard (Especially) for Risk Managers

Guest Post by Andrew Sheves (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In David McKee’s book for children ‘Not Now Bernard’, a young boy tries to warn his parents about a monster in the yard, but they’re too busy to pay attention. All they say is ‘not now Bernard’ and ignore him. In the end, the monster eats Bernard and moves into the house, but his parents are still too busy to notice.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Greg Hutchins Leave a Comment

Great Communications – A Matter of Time?

Great Communications – A Matter of Time?

Guest Post by Malcolm Peart (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

Punch lines, ad-libs, and instrumental solos, even a single note on a Tibetan singing bowl, all depend on one thing…timing.  Project Communication is also about timing and, whilst many people speak and opine with impunity the timing of written communication and converting possibly wild words into black & white can often mean the difference between collaboration and cooperation or resistance and antagonism.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Doug Lehr Leave a Comment

Failure Analysis – Failure Simulation

Failure Analysis – Failure Simulation

With the Storm Packer Root Cause Analysis complete, the probable RCs will be known. The next step is to confirm causation of the failure. In Failure Simulation (FS) the goal is to confirm cause and effect. When more than one probable RC has been identified, the FS will consist of multiple simulation tasks. How extensive will the Storm Packer’s FS program be?

[Read more…]

Filed Under: Articles, Equipment Risk and Reliability in Downhole Applications, on Risk & Safety

by Greg Hutchins Leave a Comment

Finding Certainty in an Uncertain Future

Finding Certainty in an Uncertain Future

Guest Post by Daniel Burrus (first posted on CERM ® RISK INSIGHTS – reposted here with permission)

In many ways, I am sure society is well aware of certain leadership principles that have stood the test of time in business environments. Personality traits such as integrity, honesty, and responsibility immediately come to mind; however, in a disruptive world, there are more that, many do not realize, are vital to professional success to find certainty.

[Read more…]

Filed Under: Articles, CERM® Risk Insights, on Risk & Safety

by Doug Lehr Leave a Comment

Failure Analysis – Root Cause Analysis

Failure Analysis – Root Cause Analysis

The information collected in the Storm Packer (SP) failure (Information) will establish: 

  • The timeline of events – which activity(s) preceded each significant event?
  • 3rd party impacts (process, products).
  • Product readiness at the time of installation.
  • Product suitability for the application.
  • Crew competency.
[Read more…]

Filed Under: Articles, Equipment Risk and Reliability in Downhole Applications, on Risk & Safety

  • « Previous Page
  • 1
  • …
  • 11
  • 12
  • 13
  • 14
  • 15
  • …
  • 34
  • Next Page »

Join Accendo

Receive information and updates about articles and many other resources offered by Accendo Reliability by becoming a member.

It’s free and only takes a minute.

Join Today

Recent Articles

  • test
  • test
  • test
  • Your Most Important Business Equation
  • Your Suppliers Can Be a Risk to Your Project

© 2025 FMS Reliability · Privacy Policy · Terms of Service · Cookies Policy